A canal rebuilt under a FEMA grant, a Unit 5 ditch moved into a concrete pipe, a retention pond on Tulip Drive and three baffle boxes on the riverfront.


Short answer: Sebastian's recent drainage projects are the Stonecrop canal rebuild (re-sloped, armored banks and a precast bridge at Laconia Street, 75% FEMA funded, built February to July 2025) and the Riviera and Gardenia project, which replaces an eroding Sebastian Highlands Unit 5 ditch with buried concrete pipe on a schedule into May 2026. Earlier work added the Tulip Drive retention pond in 2016 and three riverfront baffle boxes in 2014.

Last verified: October 11, 2026, against the sources listed at the end of this page.

Which drainage projects has Sebastian built or started?

Since 2014 the City of Sebastian has completed the Presidential Streets baffle boxes, the Tulip Drive retention pond and the Stonecrop canal rebuild, and in 2026 was finishing the Riviera and Gardenia ditch piping in Sebastian Highlands Unit 5.

Named drainage improvement projects in Sebastian, from City of Sebastian project pages (checked October 10, 2026)
ProjectWhereMain workFundingDates
Presidential Streets baffle boxesWashington Street, Indian River Drive at Martin Street, Coolidge StreetThree nutrient separating baffle boxes with filters at lagoon outfallsFDEP TMDL cost shareJune to December 2014
Tulip Drainage ImprovementTulip Drive, west of the Barber Street Sports ComplexWet retention pond and pocket park$176,840 Section 319 grant, $172,540 city matchCompleted December 3, 2016
Tulip habitat restorationTulip Stormwater PondFlorida-Friendly shoreline and littoral plantingIndian River Lagoon Council cost shareMay 2022 to May 2023, planting April 26, 2024
Stonecrop drainageCanal from Laconia Street to Stonecrop StreetRe-sloped banks, concrete block revetment, precast bridge at LaconiaFEMA Hazard Mitigation Grant, 75% federal and 25% cityConstruction February to July 2025
Riviera and GardeniaRiviera Avenue to Chelsea Avenue, Sebastian Highlands Unit 5Rear ditch replaced by concrete pipe under a shallow swaleCity stormwater programNovember 2025 to early May 2026 (scheduled)

Each project answers a different weakness in the Sebastian Highlands drainage grid. The city stormwater history page says General Development Corporation built the street and drainage network for roughly 15,000 home sites in the late 1950s, to standards that provide neither the storage nor the water quality treatment present rules require (City of Sebastian stormwater history). Baffle boxes and ponds address pollution reaching the Indian River Lagoon and the St. Sebastian River; canal and ditch rebuilds address capacity and bank erosion.

The projects are run by the Stormwater Utility inside Public Works and Engineering, and each has a public update page on the city site. Last verified: October 10, 2026, on the City of Sebastian website.

What did the Stonecrop drainage project change?

The Stonecrop project widened the hydraulic capacity of a municipal service canal between Laconia Street and Stonecrop Street, armored its banks and swapped the pipes under Laconia Street for a precast bridge.

The city project page lists the scope: earthwork to re-slope canal banks, removal of vegetation, and installation of an Armorflex articulating concrete block revetment system (City of Sebastian, Stonecrop updates). The existing storm piping under Laconia Street will be replaced by a precast bridge system, a ConSpan unit according to the January 2, 2025 update. The design target is protection against a 100-year storm event, and the outfall did not move: water still leaves through the stormwater pond west of Stonecrop Street toward the south prong of the St. Sebastian River.

Money came mostly from Washington. Stonecrop is a FEMA Hazard Mitigation Grant job split 75% federal and 25% City of Sebastian, and FDEM and FEMA approved it on April 29, 2024. Construction ran in three pieces. Phase 1A cleared and rebuilt the ditch from Laconia Street to Bevan Drive from February to May 2025, Phase 1B closed Laconia Street for the bridge from February into June 2025, and Phase 2 carried the ditch work from Bevan Drive to Stonecrop Street from March to July 2025.

Laconia Street reopened in a temporary condition on June 30, 2025 for about two weeks before a final mill and overlay, and the city said all construction and restoration would be finished by the end of July 2025. Earlier, in August 2024, gopher tortoise burrows in the easement stopped heavy equipment while the city applied to FWC for a relocation permit; no machine could work within 25 feet of a burrow.

What is the Riviera and Gardenia project in Sebastian Highlands Unit 5?

The Riviera and Gardenia project replaces an eroding open ditch behind homes in Sebastian Highlands Unit 5 with a buried reinforced concrete pipe, running from Riviera Avenue to Chelsea Avenue between Gardenia Street and Evernia Street.

The city explains that the ditch condition affects the lots directly beside it and a large part of Unit 5 (City of Sebastian, Riviera and Gardenia updates). A reinforced concrete piping system will be installed with a shallow swale on top to collect nearby surface water, and existing side yard pipes will be tied into the new rear pipe. Driveway culverts and road crossings in the area are part of the job, so the whole drainage area works as one system. Design started in 2021.

In Sebastian, field work began with video documentation of the easement on November 17, 2025, followed by staging, fence removal and sprinkler marking from December 16 to 19, 2025. Crews stayed off site from December 22 to January 2. A pre-condition survey from January 23 to 26, 2026 set baseline elevations so homes and accessory structures beside the trench can be checked weekly for settlement.

Wildlife set the Sebastian calendar again. Work stopped from January 27 to February 13, 2026 because gopher tortoises may only be moved when the receiving site has had evening lows above 50 degrees F for three days, a condition first met on February 14. Relocation finished February 17 to 19, crews remobilized on March 2, 2026, and the posted schedule ran structure installation through April and site restoration into early May 2026.

Why was the Tulip Drive retention pond built?

The Tulip Drive pond was built because the central Sebastian Highlands drainage could not carry heavy storm runoff, leaving streets like Tulip Drive briefly flooded, and because the Indian River Lagoon needed less nitrogen and phosphorus.

The Tulip Drainage Improvement Project was completed on December 3, 2016 (City of Sebastian, Tulip project). It added a wet retention pond, identified in the city Stormwater Master Plan as a required basin, built from drainage pipes, a box structure, grassy swales and a control flap gate. The site doubles as a neighborhood pocket park next to the Barber Street Sports Complex. The project sits within a Basin Management Action Plan for the lagoon.

The Florida Department of Environmental Protection announced the grant on December 9, 2015: $176,840 from the federal Clean Water Act Section 319 program, with the City of Sebastian matching it with $172,540 (Florida DEP). Vero News added that the plan included pervious angle parking and a new two-foot wide shallow curb steering runoff from Tulip Drive into the grass swale system near Persian Lane (Vero News, Dec. 16, 2015).

Monitoring followed under an EPA approved Quality Assurance Project Plan, sampling total nitrogen, total phosphorus and suspended solids at the pond inflow and outflow. A second phase, from May 2022 to May 2023, restored the pond edge with Florida-Friendly plantings under an Indian River Lagoon Council cost-share grant with UF/IFAS Extension of Indian River County, and volunteers planted again on National Arbor Day, April 26, 2024.

How do the Presidential Streets baffle boxes protect the Indian River Lagoon?

The Presidential Streets baffle boxes trap sediment and nutrients in runoff from the Sebastian riverfront streets before it reaches the Indian River Lagoon, removing about 80% of total phosphorus and 47% of total nitrogen.

Built between June and December 2014 with FDEP Total Maximum Daily Load cost-share funding, the project placed three filtered, nutrient separating baffle boxes at outfalls under St. Johns River Water Management District permits (City of Sebastian stormwater site). The Washington Street box drains a 37.5 acre watershed, and the Indian River Drive at Martin Street and Coolidge Street boxes serve two outfalls draining 29.4 acres. Those areas include the pavement of Washington, Martin, Cleveland and Coolidge streets, Indian River Drive and US 1 from Coolidge to Main Street.

The work came with streetscape improvements and water testing. The city began monthly sampling of discharge points for nitrogen and phosphorus in 2014, and in 2015 the League of Florida Cities gave Sebastian an achievement award for Environmental Stewardship for that monitoring program, according to the city drainage history page.

How do maintenance and the 2023 master plan fit with these projects?

Capital projects in Sebastian are chosen from the 2023 Stormwater Master Plan, while routine canal clearing, such as the 2021 Hardee Park work, keeps existing channels open between rebuilds.

The 2023 Stormwater Master Plan documents posted by the city include chapters on water quality, sea level rise, operations and maintenance, and Alternatives Development and CIP Prioritization, plus Appendix I with detailed capital cost estimates (City of Sebastian, 2023 Stormwater Master Plan). The same page posts Resolution R-24-41, the 2024 stormwater fee increase that funds the utility.

Maintenance is the other half. Sebastian Daily reported on February 28, 2021 that clearing the Hardee Park canal cost $27,000, took 339 man hours and covered 1,800 linear feet, removing 685,000 pounds of wet vegetation, and that crews also reopened the Tulip, Melrose and Potomac drainage and channels along CR 512 for nearly $60,000 in all (Sebastian Daily). Questions about an active Sebastian project go to the Citizen Request line at 772-581-0111, which the Stonecrop page also offers for text or email updates.

Frequently asked questions

Is the Stonecrop drainage project in Sebastian finished?

The City of Sebastian schedule said all Stonecrop construction and restoration would be done by the end of July 2025, after Laconia Street reopened temporarily on June 30, 2025 ahead of its final mill and overlay. No later update appears on the city page.

Who paid for the Stonecrop canal work?

A FEMA Hazard Mitigation Grant, administered with the Florida Division of Emergency Management, paid 75% of the Stonecrop project and the City of Sebastian paid 25%. FDEM and FEMA approved the project on April 29, 2024.

Why did the Riviera and Gardenia project stop in early 2026?

Gopher tortoises live in the Unit 5 ditch easement, and state rules allow relocation only after the receiving site has three evenings above 50 degrees F. Work paused from January 27 to February 13, 2026, and tortoises were moved February 17 to 19.

Can residents visit the Tulip pond in Sebastian?

Yes. The Tulip Stormwater Pond on Tulip Drive was designed as a neighborhood pocket park, and the city directs visitors to park at the Barber Street Sports Complex nearby, as it did for the April 26, 2024 Arbor Day planting.

Where are updates on Sebastian drainage projects posted?

Each project has a page under the Stormwater section of cityofsebastian.org, updated at the start and middle of each month during construction. Residents can also ask the Citizen Request line at 772-581-0111 to send text or email updates.

Sources

  1. STONECROP PROJECT UPDATES (City of Sebastian Stormwater) https://www.cityofsebastian.org/499/STONECROP-PROJECT-UPDATES Used for: Stonecrop canal scope, phases, FEMA/FDEM approval, Laconia Street bridge, gopher tortoise and schedule updates
  2. Riviera and Gardenia Project Updates (City of Sebastian Stormwater) https://www.cityofsebastian.org/561/Riviera-and-Gardenia-Project-Updates Used for: Riviera and Gardenia ditch piping scope, Unit 5, schedule, tortoise relocation
  3. Tulip Drainage Improvement Project (City of Sebastian Stormwater) https://www.cityofsebastian.org/433/Tulip-Drainage-Improvement-Project Used for: Tulip pond completion 2016, Section 319 funding, BMAP, monitoring, 2022 to 2023 habitat restoration
  4. 2023 Stormwater Master Plan Information (City of Sebastian) https://www.cityofsebastian.org/486/2023-Stormwater-Master-Plan-Information Used for: master plan chapters, CIP prioritization, R-24-41
  5. Presidential Street Baffle Boxes (City of Sebastian Stormwater site) https://stormwater.cityofsebastian.org/presidental-street-baffle-boxes.html Used for: baffle box project, TMDL grant, watershed acres, nutrient removal, 2014 construction
  6. History of Sebastian Drainage System (City of Sebastian Stormwater site) https://stormwater.cityofsebastian.org/history---restictions.html Used for: GDC drainage history, 2015 League of Cities award, 2014 monitoring
  7. City of Sebastian awarded more than $175,000 for stormwater improvement project (Florida DEP, Dec. 9, 2015) https://content.govdelivery.com/accounts/FLDEP/bulletins/1284f38 Used for: Tulip grant amount and city match
  8. City of Sebastian gets $175,000 in grants for Stormwater Improvement Project (Vero News, Dec. 16, 2015) https://veronews.info/?p=86457 Used for: Tulip design: pervious parking, shallow curb at Tulip and Persian Lane
  9. City of Sebastian tackling drainage issues. Here's what they've done. (Sebastian Daily, Feb. 28, 2021) https://www.sebastiandaily.com/business/city-of-sebastian-tackling-drainage-issues-heres-what-theyve-done-27588/ Used for: Hardee Park canal clearing cost and volumes, other basins cleared
  10. U.S. Census Bureau American Community Survey 2023 https://www.census.gov/programs-surveys/acs Used for: Sebastian population
Last updated: October 11, 2026

Continue exploring

Photo credits