Short answer: Tallahassee's electricity comes mainly from two City-owned natural gas plants. The Arvah B. Hopkins station on Geddie Road, 7 miles west of town, is rated at 484.5 MW in summer in the City's 2026 Ten-Year Site Plan. The Sam O. Purdom station beside the St. Marks River in Wakulla County is rated at 222 MW. A small Substation 12 plant and two airport solar farms complete the 737 MW system.
Last verified: October 18, 2026, against the sources listed at the end of this page.
Where does Tallahassee's electricity come from?
Most Tallahassee electricity comes from two City-owned natural gas plants, Hopkins on Geddie Road and Purdom at St. Marks, backed by a small distributed plant and two airport solar farms.
The City's 2026 Ten-Year Site Plan, filed with the Florida Public Service Commission, says the Electric Utility serves approximately 124,000 customers within a 221 square mile service territory and had a total net summer capability of 737 MW and winter capability of 795 MW as of December 31, 2025. Both the Hopkins page and the Purdom page list natural gas as the primary fuel.
Solar is the third leg, and two City sources describe it differently. The site plan lists Solar Farm 1 at 20 MW and Solar Farm 4 at 42 MW nameplate, online in December 2017 and December 2019, and counts only 20 percent of their rating as firm summer capacity. The City's Tallahassee Solar page describes Solar Farm 1 at 20 megawatts on 120 acres and Solar Farm 2 at 40 megawatts on 240 acres, 60 megawatts in all. Customers in that program pay a solar rate of 5 cents per kWh in place of the fuel charge, fixed until September 30, 2037; the program is fully subscribed and enrollment has closed.
Water power was a sideline that has ended. The City told the Florida PSC in 2019 that its Lake Talquin hydro plant averaged about 17 GWh a year, less than 1 percent of its energy needs, and that FERC accepted the surrender of the license on March 13, 2019. The City had run that Jackson Bluff powerhouse on the Ochlockonee River under a federal license issued on July 14, 1982, with units installed in 1986, according to the FERC environmental assessment.
What is the Hopkins power plant on Geddie Road?
The Hopkins station is the larger Tallahassee plant, on 230 acres of land 7 miles west of the city on Geddie Road.
The City's Hopkins page lists it as built in 1971, fueled primarily by natural gas, with a capacity of 504 megawatts. It burns natural gas or oil to make steam in two boilers that drive two turbines connected to generators, and two gas turbine generators add power when needed. The plant was expanded to more than double its original size in 1977 with a second boiler and generator, and the City later converted Unit 2 to a combined cycle system under the Hopkins Unit 2 Repowering Project. The grounds, covered with oaks and pines, shelter birds, deer, alligators and a community of beavers.
The 2026 site plan fills in dates and differs on two numbers. It says Hopkins has been in commercial operation since 1970, a year earlier than the City page, and rates the plant at 484.5 MW in summer and 518.5 MW in winter, against the page's 504 megawatts. Unit 2's repowered combined cycle unit, built around a General Electric Frame 7A combustion turbine, entered commercial operation in June 2008; its original steam turbine generator dates to October 1977. The City keeps enough distillate fuel oil to run Hopkins about 3 days.
The plant runs 24 hours a day, 365 days a year, and chemists in its laboratory perform more than 40 tests on water every day for metal contaminants, mineral precipitates and acidity, the City states, with a separate environmental monitoring facility for independent oversight. Geddie Road also leads to the Lake Talquin State Forest office at 865 Geddie Road, per FDACS.
What is the Purdom plant at St. Marks?
The Purdom station is the older Tallahassee plant, built in 1952 on 63 acres beside the Saint Marks River in Wakulla County, about 20 miles south of the city.
The City's Purdom page says two of the plant's three boilers and steam turbines were retired and replaced by a combined cycle system that generates power at a rate 30 percent more efficient than older systems. Purdom Unit 8 uses the energy from the burned fuel twice, so the same fuel powers two generators instead of one, and cooling towers vent heat from the cooling water into the air as steam.
The Purdom page lists a capacity of 242 MW in its summary while its text says the plant can generate up to 301 megawatts; the 2026 site plan rates Unit 8 at 222 MW in summer and 258 MW in winter, in commercial service since July 2000. The plan adds that facility-wide emissions caps limit the use of liquid fuel at Purdom, and that the City keeps enough distillate oil to run the plant about 9 days.
Water is the local issue at St. Marks. The City says Unit 8 uses Zero-Discharge Technology, recycling treated effluent from the City of St. Marks wastewater treatment plant and a local industrial facility to reduce its dependence on river water, with no liquid discharge into the St. Marks River.
Which generating units run at Hopkins and Purdom?
Hopkins has one combined cycle unit, two combustion turbines and five gas engines, while Purdom runs a single combined cycle unit, per the City's 2026 Tallahassee site plan.
| Unit | Type | In service | Expected retirement | Summer MW |
|---|---|---|---|---|
| Purdom 8 | Combined cycle | July 2000 | December 2040 | 222.0 |
| Hopkins 2 | Combined cycle (repowered) | June 2008 | June 2048 | 300.0 |
| Hopkins GT-3 | Combustion turbine | September 2005 | September 2045 | 46.0 |
| Hopkins GT-4 | Combustion turbine | November 2005 | November 2045 | 46.0 |
| Hopkins IC-1 to IC-4 | Gas engines | February and March 2019 | 2049 | 18.5 each |
| Hopkins IC-5 | Gas engine | April 2020 | April 2050 | 18.5 |
| Substation 12 IC-1 and IC-2 | Gas engines | October 2018 | October 2048 | 9.2 each |
Source: City of Tallahassee 2026 Ten-Year Site Plan, Schedule 1, which lists the Hopkins units and Substation 12 in Leon County and Purdom 8 in Wakulla County. The combined cycle and combustion turbine units can burn natural gas or diesel oil but not both at once, while the engines burn natural gas only. Hopkins 2's nameplate is the sum of a 198.9 MW combustion turbine generator and a 259.2 MW steam turbine generator, though in its current configuration the steam side is limited to about 150 MW.
How do the gas plants fit Tallahassee's clean energy target?
Tallahassee has set a target of 100 percent net clean renewable energy by 2050, but its 2026 plan keeps Hopkins and Purdom running with no additions or retirements through 2035.
The City's Clean Energy Plan page says that through the Clean Energy Resolution, 19-R-04, the City Commission set a target of achieving 100 percent net, clean renewable energy no later than 2050, and that the resolution passed unanimously. The 2026 Ten-Year Site Plan finds no need for more firm capacity in the 2026 to 2035 period and schedules no additions or retirements, so summer and winter firm capacity are unchanged from the prior plan.
The same Tallahassee plan points to storage as the next step. Operating through recent winter storms, which drove loads close to records, reinforced the City's view that energy storage could reduce costs, increase short-duration capacity, lower risk and cut dependence on natural gas. The City is not subject to the Florida Energy Efficiency and Conservation Act, so the PSC sets no numeric conservation goals for it, though the plan states the City expects to continue its demand side management programs.
Last verified: October 18, 2026, on the City's Hopkins, Purdom, Tallahassee Solar and Clean Energy Plan pages, its 2026 Ten-Year Site Plan and 2019 data response at the Florida PSC, the FERC Jackson Bluff assessment, and the FDACS Lake Talquin State Forest page.
Frequently asked questions
How many power plants does the City of Tallahassee own?
Three generating stations: Hopkins west of town, Purdom at St. Marks and the small Substation 12 plant on Medical Drive. The City also buys all the output of two solar farms at Tallahassee International Airport.
Where is the Purdom power plant?
On 63 acres beside the Saint Marks River in Wakulla County, about 20 miles south of Tallahassee. The City lists it as built in 1952.
What fuel do the Tallahassee power plants burn?
Natural gas is the primary fuel at both. The combined cycle and combustion turbine units can also run on diesel oil, but the gas engines burn natural gas only.
Does the Purdom plant discharge water into the St. Marks River?
No. The City says Unit 8 uses Zero-Discharge Technology, recycling treated effluent from the City of St. Marks wastewater plant and a local industrial facility, with no liquid discharge to the river.
When will Tallahassee stop using natural gas for power?
No closing date is set. The Clean Energy Resolution, 19-R-04, targets 100 percent net clean renewable energy by 2050, and the 2026 site plan lists expected retirement dates from 2040 for Purdom 8 to 2050 for the newest Hopkins engine.
Sources
- City of Tallahassee 2026 Ten-Year Site Plan (Florida PSC filing 02643-2026) https://www.floridapsc.com/library/filings/2026/02643-2026/02643-2026.pdf Used for: customers, 737 and 795 MW, Schedule 1 unit table, in-service and retirement dates, fuel rules, oil storage, solar firm capacity, no additions or retirements, storage, FEECA
- City of Tallahassee response, Review of the 2019 Ten-Year Site Plans, Supplemental Data Request 2 (Florida PSC filing 05673-2019) https://www.floridapsc.com/library/filings/2019/05673-2019/05673-2019.pdf Used for: hydro output and surrender acceptance
- Arvah B. Hopkins Power Generating Station, City of Tallahassee https://www.talgov.com/you/you-learn-utilities-electric-hopkins.aspx Used for: 1971, 504 MW, 230 acres, Geddie Road, 1977 expansion, Unit 2 repowering, water tests
- Sam O. Purdom Generating Station, City of Tallahassee https://www.talgov.com/you/you-learn-utilities-electric-purdom.aspx Used for: 1952, 242 and 301 MW, 63 acres, Wakulla County, combined cycle, zero discharge
- Tallahassee Solar Program, City of Tallahassee Utilities https://www.talgov.com/you/solar Used for: Solar Farm 1 and 2 acreage and MW, 5 cents per kWh to 2037, program closed
- Clean Energy Plan, City of Tallahassee https://www.talgov.com/sustainability/cleanenergyplan Used for: Clean Energy Resolution 19-R-04, 2050 target, unanimous passage
- Environmental Assessment, Jackson Bluff Hydroelectric Project No. 2891-017 (FERC) https://www.ferc.gov/sites/default/files/2020-06/P-2891-017-EA.pdf Used for: 1982 City license, 1986 units
- Lake Talquin State Forest, Florida Department of Agriculture and Consumer Services https://www.fdacs.gov/Forest-Wildfire/Our-Forests/State-Forests/Lake-Talquin-State-Forest Used for: forest office at 865 Geddie Road
How this page was made
Digital Towns uses AI assistance to research and write its guides, and every page is only as good as the sources it cites. Our goal is the most accurate, useful local information possible.
This page was fact-checked twice before publishing.
If you see an error, or anything you can show is false, tell us right away and we will take a third look.
Report an error
Thank you. We'll take a third look and correct the page if it's wrong.