Embraer's first U.S. final assembly line opened at the Melbourne airport in February 2011 and doubled in size with the Legacy complex in 2016.


Short answer: Embraer assembles business jets at Melbourne Orlando International Airport. The company broke ground in December 2008, opened its first U.S. final assembly plant there in February 2011 for the Phenom 100 and Phenom 300, and opened a 236,000-square-foot Legacy expansion in June 2016. Florida Trend reported in 2022 that the Melbourne campus also handles final assembly of the Praetor 500 and Praetor 600.

When did Embraer come to Melbourne?

Embraer's Melbourne story begins with a groundbreaking in December 2008 on airport land at what was then Melbourne International Airport. According to the company's groundbreaking release, Florida Governor Charlie Crist and Melbourne Mayor Harry Goode handled ceremonial shovels beside Embraer chief executive Frederico Fleury Curado, and the site was billed as the company's first U.S. aircraft assembly plant and customer center. The plan called for completion in 2010 and an eventual rate of up to eight Phenom business jets per month from the Melbourne line.

The project was announced shortly after the Phenom 300 prototype began flying in May 2008, AVweb noted when the plant was ready. Curado said at the 2008 ceremony that Embraer's presence in Florida dated back to 1979, but the Melbourne airport site was the first place the Brazilian manufacturer would put an aircraft final assembly line on U.S. soil. The EDC of Florida's Space Coast later recalled that Embraer chose Brevard County in 2008, at a time when companies were downsizing.

What was built in the first phase at Melbourne International Airport?

The 2008 plan described a 150,000-square-foot complex: a final assembly line able to build both the Phenom 100 and Phenom 300, a paint shop, and a delivery and customer design center. The pieces opened in two steps in 2011. AVweb reported on February 15, 2011 that the 90,000-square-foot assembly plant would be opened with a ribbon cutting on February 21, that the plant represented a $50 million project, and that about 200 people would work there, with flight testing and delivery preparation also handled at the Melbourne airport.

The second step came in December 2011. AVweb's December 6, 2011 report describes a 58,000-square-foot customer center that cost $50 million and took three years to build, with a showroom, five design studios and a delivery hangar, located next door to the assembly plant. The same day Embraer delivered the first U.S.-assembled Phenom 100 from Melbourne. The company then employed more than 100 workers in Melbourne and planned 90 more positions, and AVweb noted that former employees of NASA's space shuttle program had provided some of that talent. Embraer also held an option on an additional 70 acres at the airport for future expansion.

How did the Legacy expansion double the Melbourne campus?

The second chapter began on October 30, 2013, when Governor Rick Scott announced at Melbourne International Airport that Embraer had chosen the site to build its Legacy 450 and Legacy 500 midsize jets. Trade and Industry Development reported 600 projected jobs and $28 million in capital investment for equipment, with the decision contingent on final approval of a partnership between the company, state and local officials; Melbourne Mayor Kathy Meehan joined the announcement. Flying magazine reported that the plan added 236,000 square feet to the 138,000-square-foot facility then in use, plus a 74,000-square-foot engineering and technology center.

Ground was broken on October 13, 2014. In the groundbreaking report, Embraer described the addition to an existing 212,000-square-foot campus at Melbourne International Airport and called its recently inaugurated Engineering and Technology Center the first engineering center outside Brazil. The Legacy complex opened on June 2, 2016. The EDC of Florida's Space Coast called it Embraer's third facility expansion at the airport, made up of four new buildings: an assembly hangar, a paint facility, a completion center and flight preparation facility, and a dedicated delivery center. Embraer Executive Jets chief Marco Tulio Pellegrini said the addition doubled the size of the Melbourne campus.

Which jets are assembled in Melbourne today?

Production at the airport grew one model at a time. AVweb's June 2016 report states that the Melbourne production facility began operations in February 2011, that the first Phenom 100 was delivered in December of that year, and that the Phenom 300 was added to the multi-model, paperless final assembly line in August 2012. By June 2016 more than 170 Phenom jets, valued at over USD 1 billion, had been produced in Melbourne for buyers in the United States and 14 other countries.

In May 2015 AIN reported that Embraer was transferring all Phenom assembly to Melbourne in 2016, and that the Florida plant had capacity for up to 96 Phenoms per year. Wings and fuselages for the two light jets continued to be made in Brazil, so the Melbourne line is a final assembly operation. A 2022 Florida Trend item lists the work done on the campus that year: the assembly line for the Phenom 100EV and Phenom 300E, final assembly of the Praetor 500 and Praetor 600, a 58,000 square foot Global Customer Center, and an Engineering and Technology Center. The same item describes Melbourne as the headquarters of Embraer's Executive Jets unit on a 67-acre campus.

Who helped bring Embraer to Melbourne, and how many jobs were announced?

Each phase was negotiated with public partners. The 2013 and 2014 announcements credit Governor Scott and Enterprise Florida, the Economic Development Commission of Florida's Space Coast, Brevard County, the City of Melbourne and the Melbourne Airport Authority, and the 2013 list also includes Space Florida and Brevard Workforce. At the October 2014 groundbreaking Scott pointed to Florida's removal of the sales tax on manufacturing equipment as an advantage for companies such as Embraer. The dollar value of any local award to Embraer does not appear in the sources reviewed for this page.

Announced employment rose with each building. About 200 jobs were planned for the 2011 Phenom plant. In October 2014 the company said it would add 600 hires to almost 400 employees in the area over four years beginning in 2016. At the June 2016 opening, the EDC said the 600 new positions would bring Embraer's announced jobs in Brevard County to 1,000 since 2008, and Scott said the company already employed more than 1,000 Floridians. In April 2022 Florida Trend reported more than 150 open positions at the Melbourne facility, including assembly technicians, aircraft painters and quality inspectors, with a hiring event run with CareerSource Brevard County in Rockledge.

Today the airport authority's Land Development and Growth page lists Embraer among the notable tenants of Melbourne Orlando International Airport, alongside Northrop Grumman, L3Harris, Dassault Falcon Jet and Satcom Direct. The Embraer buildings stand on the same airfield where the assembly plant opened in February 2011, and the 70-acre option reported that December shows how the airport land was set aside for the growth that followed in 2016.

Frequently asked questions

Is Embraer's Melbourne plant its first factory in the United States?

Yes. The 2008 groundbreaking release and AVweb's 2011 coverage both describe the Melbourne International Airport site as Embraer's first U.S. aircraft assembly plant, opened with a ribbon cutting in February 2011.

Are whole airplanes built from scratch in Melbourne?

No. AIN reported in May 2015 that wings and fuselages for the Phenom light jets are made in Brazil, while Melbourne performs final assembly, painting, flight preparation and delivery at the airport.

How big is the Embraer campus at the Melbourne airport?

Florida Trend described a 67-acre campus in April 2022. Floor space grew from an existing campus of about 212,000 to 213,000 square feet in 2014 and 2016 reports, plus the 236,000-square-foot Legacy addition.

When did Legacy jet production start in Melbourne?

AVweb reported that Embraer Executive Jets began Legacy 450 and Legacy 500 production in Melbourne with a ribbon cutting on June 2, 2016, attended by Governor Rick Scott and Brevard County and city officials.

How many people did Embraer say it would employ in Brevard County?

The EDC of Florida's Space Coast said in June 2016 that 600 planned hires would bring Embraer's announced jobs to 1,000 since it arrived in Brevard County in 2008.

Sources

  1. Embraer breaks ground for its first U.S. assembly plant (Embraer press release on Airframer, December 2008) https://www.airframer.com/news/release/3537 Used for: 2008 groundbreaking, officials, 150,000 sq ft plan, eight per month, Florida since 1979
  2. Embraer Opens Florida Plant (AVweb, February 15, 2011) https://avweb.com/?p=96868 Used for: February 2011 opening, 90,000 sq ft, $50 million, about 200 jobs
  3. Embraer Opens In Florida (AVweb, December 6, 2011) https://avweb.com/?p=95800 Used for: customer center, first U.S.-assembled Phenom 100, shuttle workforce, 70-acre option
  4. FL: Embraer to Invest $28M, Create 600 New Melbourne Jobs (Trade and Industry Development, October 30, 2013) https://www.tradeandindustrydev.com/industry/aerospace-defense/news/fl-embraer-invest-28m-create-600-new-melbourne-8489 Used for: Legacy 450/500 selection announcement and partners
  5. Embraer Legacy 450 and 500 to Be Built in Melbourne (Flying, October 31, 2013) https://www.flyingmag.com/news-embraer-legacy-450-and-500-be-built-melbourne/ Used for: 236,000 sq ft addition, 138,000 sq ft existing, 74,000 sq ft engineering center
  6. FL: Embraer Breaks Ground on 600-New-Job Legacy 500/450 Assembly Facility (Trade and Industry Development, October 13, 2014) https://www.tradeandindustrydev.com/industry/aerospace-defense/news/fl-embraer-breaks-ground-600-new-job-legacy-500450-9665 Used for: 2014 groundbreaking, 212,000 sq ft campus, engineering center, hiring plan, sales tax remark
  7. Embraer's Legacy 450/500 Assembly Facility Open for Business (EDC of Florida's Space Coast, June 2, 2016) https://spacecoastedc.org/?p=446 Used for: 2016 opening, four buildings, 1,000 announced jobs since 2008
  8. Embraer Begins Legacy Production In Florida (AVweb, June 2, 2016) https://avweb.com/?p=116495 Used for: operations timeline, Phenom 300 added 2012, 170 jets produced
  9. Embraer Moving All Phenom Assembly to U.S. (AIN, May 12, 2015) https://www.ainonline.com/aviation-news/business-aviation/2015-05-12/embraer-moving-all-phenom-assembly-us Used for: all Phenom assembly to Melbourne in 2016, 96 per year capacity
  10. Embraer brings over 150 jobs to Melbourne, Florida facility (Florida Trend, April 19, 2022) https://www.floridatrend.com/article/33526/embraer-brings-over-150-jobs-to-melbourne-florida-facility Used for: campus description, aircraft built, 67 acres, 2022 hiring
  11. Land Development and Growth (Melbourne Orlando International Airport) https://www.mlbair.com/business-opportunities/land-development-and-growth Used for: notable airport tenants
  12. U.S. Census Bureau American Community Survey 2023 https://www.census.gov/programs-surveys/acs Used for: Melbourne population and demographic figures
Last updated: October 8, 2026