General Development Corporation and Sebastian Highlands — Sebastian, Florida

From a 1957 purchase of 1,345 acres to 15,000 platted home sites, the Sebastian Highlands street and swale grid is General Development Corporation's work.


Short answer: General Development Corporation built Sebastian Highlands. Its Miami predecessor, the Mackle Brothers, bought 1,345 acres in Sebastian in 1957, and in the late 1950s GDC built streets and drainage for about 15,000 home sites, then sold quarter-acre lots at $500 across the Northeast. The City of Sebastian inherited the swales, ditches and canals, plus vacant lots after GDC's 1990 bankruptcy.

Last verified: October 10, 2026, against the sources listed at the end of this page.

Who built Sebastian Highlands, and when?

General Development Corporation, the company that grew out of the Miami-based Mackle Brothers, built Sebastian Highlands after buying 1,345 acres in Sebastian in 1957 (Congressional Record).

Sebastian Highlands, the grid of curving streets, swales and canals that fills most of Sebastian between U.S. 1 and the St. Sebastian River, was a General Development Corporation project. In a Congressional Record statement entered on November 13, 2024, for the city's centennial, Rep. Bill Posey wrote that the Mackle Brothers, a developer based in Miami, which later became General Development Corporation, bought land throughout Florida for planned communities, including 1,345 acres in Sebastian in 1957 to develop Sebastian Highlands.

The purchase came when Sebastian was still a small river town. Vero Beach Magazine records that commercial fishing families ran fish houses that dotted the riverfront along Indian River Drive, and that the population numbered fewer than 400 some 70 years before its 2024 article. The Highlands changed the shape of the place: an old town on the lagoon, and then a platted subdivision many times its size spread west and south toward the river. By the 2000 census, according to the same Posey statement, Sebastian had become the most populous city in Indian River County, a position it still holds.

When did each stage of Sebastian Highlands happen?

Sebastian Highlands took shape over about four decades, from the 1957 land purchase to a mostly built-out subdivision by the late 1990s (Congressional Record).

Sebastian Highlands timeline, 1957 to 2000
YearSebastian Highlands milestoneSource
1957The Mackle Brothers buy 1,345 acres in Sebastian for Sebastian HighlandsCongressional Record, 2024
Late 1950sGDC builds Sebastian street and drainage infrastructure for about 15,000 home sitesCity of Sebastian
1970sQuarter-acre Sebastian Highlands lots advertised at $500 across the NortheastVero Beach Magazine, 2024
1990GDC files for bankruptcy and the City of Sebastian acquires vacant lotsSebastian Daily, 2024
Late 1990sMost Sebastian Highlands home sites developedCity of Sebastian
2000 censusSebastian becomes the most populous city in Indian River CountyCongressional Record, 2024

What did General Development build before the houses?

Before any houses went up, General Development built the Sebastian Highlands street grid and an open drainage network of canals, ditches and swales sized for about 15,000 home sites (City of Sebastian).

GDC built the roads and the drainage first and sold the lots afterward. The City of Sebastian's drainage system history states that in the late 1950s, General Development Corporation (GDC) designed and constructed the street and drainage infrastructure to support development of approximately 15,000 single-family home sites. The Sebastian Highlands system was installed during the early phases of the land development to the 1950's standards, which means open channels that move water quickly rather than hold and clean it.

The scale explains why Sebastian's stormwater network is so large for a city of its population. The same city page places Sebastian along nearly 9 miles of the lower eastern and southern banks of the St. Sebastian River, covering about 9,000 acres of the 100,000 acre Sebastian River Watershed. The majority of the City's storm water run-off is delivered by a system of canals, ditches and swales to the St. Sebastian River, which drains to the Indian River Lagoon.

Today the city's Stormwater Utility lists what GDC left behind: a collection and treatment system of swales, ditches, culverts, catch basins, baffle boxes and the 8.15 mile Elkcam Canal/Collier Creek Canal. Collier Creek and the Elkcam waterway run through the middle of the Highlands, and the roadside swale in front of nearly every Highlands lot is part of the same GDC design.

How were Highlands lots sold?

General Development sold Sebastian Highlands lots through advertising, offering quarter-acre lots for $500 to buyers across the Northeast during the 1970s (Vero Beach Magazine).

General Development sold Sebastian by mail and advertisement to buyers who often had never seen the land. Vero Beach Magazine reported in July 2024 that growth in Sebastian was slow until the 1970s, when GDC, which it describes as a major developer in Florida, platted some 1,345 acres and advertised its quarter-acre, $500 lots throughout the Northeast. The magazine writes that the lots attracted retirees looking for affordable housing and warm weather, and that the affordable housing also drew people who worked in Vero Beach.

Selling lots far ahead of building meant the Highlands filled in over decades rather than years. The City of Sebastian states that most of the roughly 15,000 home sites have been developed by the late 1990s, about forty years after the street grid went in. The result is the pattern still visible along Highlands streets off Barber Street and Schumann Drive: houses of many decades side by side on lots of the same size, each fronted by its own swale and driveway culvert, with vacant lots in between.

The population record reflects that slow fill. Rep. Posey's 2024 statement puts Sebastian's 2023 population at 26,825 and notes that 35 percent of the population is 65 or older, the retirement profile GDC's northeastern advertising first drew.

What happened to Sebastian lots when General Development went bankrupt in 1990?

When General Development filed for bankruptcy in 1990, the City of Sebastian acquired vacant Highlands lots that it still held in 2024 (Sebastian Daily).

General Development's collapse left the City of Sebastian holding land. Sebastian Daily reported in December 2024 that a group of vacant parcels owned by the city were acquired when General Development Corporation filed for bankruptcy in 1990, and that the company's bankruptcy was considered one of the most complicated in the state's history.

Those GDC-era lots resurfaced in 2024. The Sebastian City Council partnered with Indian River Habitat for Humanity and proposed donating 12 acres of the former GDC land for single-family homes, with city employees given priority. Residents of Concha Drive, Adams Street and Acorn Terrace objected at a council meeting, saying they had not been properly notified; Mayor Bob McPartlan said the homes would be single-family houses bought through sweat equity and mortgage payments. Sebastian Daily reported that zoning changes were still necessary and that the first house could take years.

Who maintains the GDC drainage system now?

The City of Sebastian Stormwater Utility maintains the GDC canals, ditches and baffle boxes, while each Highlands homeowner keeps up the front yard swale and driveway culvert (City of Sebastian).

The city does, with help from every Highlands homeowner. The City of Sebastian's stormwater FAQ states that each homeowner is responsible for maintaining his/her own front yard swale and driveway culvert, a rule that comes straight from the GDC design of roadside swales instead of curbs and storm sewers. City Stormwater Utility staff clean all City of Sebastian baffle boxes quarterly, and Ordinance O-13-11 set up Sebastian's stormwater quality and discharge control program under the federal Clean Water Act.

Water quality is the gap the city is closing. The city's drainage history says the GDC system does not provide the storm water storage or water quality treatment required by present day development standards. The city has 9 baffle boxes installed at outfall points, and its stormwater website reports that monthly sampling of discharges for nitrogen and phosphorus began in 2014. Sebastian's 2023 Stormwater Master Plan adds a sea level rise assessment and a capital improvement plan, and the council followed with Resolution R-24-41, a stormwater impact fee increase.

Why does sewer service in Sebastian lag the GDC street grid?

The city record of what GDC built in Sebastian lists streets and drainage but no sewer system, so central sewer has come later through Indian River County and city projects (City of Sebastian).

The City of Sebastian's account of what GDC built lists streets and drainage; it does not list a sewer system. Connecting Sebastian homes and businesses to central sewer has since become a long-running Indian River County and City of Sebastian effort. In 2017, House Bill 4281 requested a $2,500,000 state appropriation for Indian River County-Sebastian Septic to Sewer; it died in the Appropriations Committee on May 8, 2017.

The current approach is an interlocal agreement. WQCS reported on September 12, 2025, that Indian River County Utility Services would install public sewer pipes so residents and businesses in Sebastian's Community Redevelopment Area could connect, and that the county had another grant project planned for north Sebastian. The Highlands, the largest piece of GDC's 1957 purchase, is the area that future phases would have to reach.

Frequently asked questions

How many home sites did General Development plan in Sebastian?

The City of Sebastian states that GDC built street and drainage infrastructure for approximately 15,000 single-family home sites in the late 1950s, and that most of those Sebastian Highlands sites had been developed by the late 1990s.

What did a Sebastian Highlands lot cost in the 1970s?

Vero Beach Magazine reported in 2024 that General Development advertised quarter-acre Sebastian Highlands lots at $500 throughout the Northeast during the 1970s, drawing retirees and workers commuting to Vero Beach.

Who keeps the swale in front of a Sebastian Highlands house clear?

Under the City of Sebastian stormwater FAQ, the homeowner maintains the front yard swale and driveway culvert. City Stormwater Utility crews handle the ditches, canals and baffle boxes, cleaning the baffle boxes every quarter.

Does the City of Sebastian own former General Development land?

Yes. Sebastian Daily reported in December 2024 that the city owns vacant lots acquired when General Development filed for bankruptcy in 1990, including 12 acres proposed for Indian River Habitat for Humanity homes.

What is the Elkcam Canal in Sebastian?

The City of Sebastian lists the 8.15 mile Elkcam Canal and Collier Creek Canal as part of its Stormwater Utility system, alongside the swales, ditches, culverts and baffle boxes that carry Highlands runoff to the St. Sebastian River.

Sources

  1. Recognizing the Centennial of Sebastian, Hon. Bill Posey, Congressional Record Vol. 170 No. 167, November 13, 2024, page E1135 https://www.govinfo.gov/content/pkg/CREC-2024-11-13/html/CREC-2024-11-13-pt1-PgE1135.htm Used for: Mackle Brothers and General Development Corporation, 1,345 acres bought in 1957 for Sebastian Highlands, most populous city by 2000 census, 2023 population 26,825
  2. The History of Sebastian Drainage System, City of Sebastian Stormwater Division https://cityofsebastian.org/434/The-History-of-Sebastian-Drainage-System Used for: GDC street and drainage infrastructure in the late 1950s for about 15,000 home sites; 1950s standards; canals, ditches and swales to the St. Sebastian River; 9,000 acres of 100,000-acre watershed; 9 baffle boxes; 2015 League of Florida Cities award
  3. History, Fees and Restrictions, City of Sebastian Stormwater website https://stormwater.cityofsebastian.org/history---restictions.html Used for: 2014 start of monthly stormwater sampling; Presidential Streets baffle boxes; existing system described as inadequate for water quality
  4. Stormwater Home, City of Sebastian https://www.cityofsebastian.org/423/Stormwater Used for: Stormwater Utility system of swales, ditches, culverts, catch basins, baffle boxes and the 8.15 mile Elkcam Canal/Collier Creek Canal; homeowner swale responsibility; Ordinance O-13-11
  5. Stormwater Frequently Asked Questions, City of Sebastian https://www.cityofsebastian.org/Faq.aspx?TID=30 Used for: homeowner maintains front yard swale and driveway culvert; baffle boxes cleaned quarterly
  6. 2023 Stormwater Master Plan Information, City of Sebastian https://www.cityofsebastian.org/486/2023-Stormwater-Master-Plan-Information Used for: 2023 Stormwater Master Plan chapters including sea level rise assessment; R-24-41 stormwater impact fee increase
  7. Celebrating Sebastian: A Big Small Town, Vero Beach Magazine, July 15, 2024 https://verobeachmagazine.com/features/celebrating-sebastian-a-big-small-town/ Used for: slow growth until the 1970s; GDC platted some 1,345 acres; quarter-acre $500 lots advertised in the Northeast; retirees and Vero Beach workers
  8. Sebastian City Council faces backlash over Habitat for Humanity land, Sebastian Daily, December 2024 https://www.sebastiandaily.com/business/sebastian-city-council-faces-backlash-over-habitat-for-humanity-land-74557/ Used for: city-owned lots acquired when GDC filed for bankruptcy in 1990; 12 acres donated to Indian River Habitat for Humanity; Concha Drive, Adams Street, Acorn Terrace
  9. HB 4281 (2017) Indian River County-Sebastian Septic to Sewer, The Florida Senate https://flsenate.gov/Session/Bill/2017/4281 Used for: $2,500,000 appropriation request that died in Appropriations Committee on May 8, 2017
  10. City of Sebastian collaborates with county on septic-to-sewer conversions, WQCS, September 12, 2025 https://www.wqcs.org/wqcs-news/2025-09-12/city-of-sebastian-collaborates-with-county-on-septic-to-sewer-conversions Used for: 2025 interlocal agreement; county installs public sewer pipes in the CRA; north Sebastian grant project
  11. U.S. Census Bureau American Community Survey 2023 https://www.census.gov/programs-surveys/acs Used for: Sebastian population 25,759 and owner-occupancy 83.5 percent
Last updated: October 10, 2026

Continue exploring

Photo credits