Main Street Bridge in Jacksonville, Florida

The 1941 vertical lift bridge between the Northbank and the Southbank, officially the J.T. Alsop Bridge, with a 365-foot lift span.


Short answer: The Main Street Bridge, also called the J.T. Alsop Bridge, is a 1941 steel vertical lift bridge carrying U.S. 1 over the St. Johns River between Downtown Jacksonville's Northbank and Southbank. FDOT records it as 1,680 feet long with a 365-foot lift span, the largest of Florida's four remaining lift bridges. City Council's records call it the John T. Alsop Jr. Bridge, commonly known as the Main Street Bridge, and in January 2026 the Council backed a National Register nomination.

Last verified: October 18, 2026, against the sources listed at the end of this page.

What is the Main Street Bridge?

The Main Street Bridge is a 1941 steel vertical lift bridge that carries U.S. 1 across the St. Johns River in Downtown Jacksonville.

The Florida Department of Transportation's Historic Highway Bridges of Florida inventory lists it as FDOT bridge No. 720022, Florida Master Site File number 8DU1553, under the names Main Street Bridge and J.T. Alsop Bridge, carrying US-1 over the St. Johns River. The report calls it one of the premier historic bridges in Florida and says it is significant both for its technology and as a defining element in the Jacksonville skyline.

The City of Jacksonville describes the bridge as connecting Downtown's Northbank and Southbank over the St. Johns River in a August 7, 2026 notice, which also refers to the bridge's southbound pedestrian walkway. In federal drawbridge rules the crossing is the Main Street (1/SR 90) drawbridge at mile 24.7 of the river, per 33 CFR 117.325.

When was the Main Street Bridge built, and by whom?

Duval County voters approved the bridge in 1935, the federal government agreed in 1938 to pay half the cost, and it was completed in 1941 by the Mt. Vernon Bridge Company of Ohio.

The FDOT historic bridge report states that construction cost approximately $1.5 million and required 3,800 tons of steel, 460 tons of metal reinforcements and 30,000 tons of concrete. In 1938 the U.S. Bureau of Roads agreed to pay one-half of the project's costs. In 1941 the Shell Products Company of Ohio, the Foundation Company of New York City and the Mt. Vernon Bridge Company of Ohio contributed money to complete construction.

The same report explains why the Jacksonville bridge is considered historic. FDOT determined it eligible for the National Register of Historic Places in its 2000 survey, under Criterion A in the area of Community Planning and Development for its role in facilitating the development of Jacksonville, and under Criterion C in the area of Engineering as a rare extant vertical lift bridge associated with the Mt. Vernon Bridge Company. Its summary table records the status as EL: 2000, meaning eligible, not listed.

Main Street is not the only Jacksonville river crossing in that FDOT inventory. The same Duval County list includes the Mathews Bridge over the St. Johns River, built in 1953 and rated potentially eligible in 2007, and the Hart Bridge, built in 1967 and recommended eligible in 2010, per the FDOT report.

Why does the Main Street Bridge have two names?

The bridge's formal name is the John Alsop Jr. Bridge, but Jacksonville's city, state and federal documents still use the Main Street name.

The City Council's own record uses both names at once: Resolution 2025-0881, on the January 13, 2026 Council agenda, is titled as support for the John T. Alsop Jr. Bridge, commonly known as the Main Street Bridge. FDOT's historic bridge inventory lists it as Main Street Bridge/J.T. Alsop Bridge, and the federal drawbridge rule in 33 CFR 117.325 uses only the Main Street name. City closure notices from August 2026 also call it the Main Street Bridge.

Official documents use both names. FDOT's inventory pairs Main Street Bridge with J.T. Alsop Bridge, and the Jacksonville City Council's Resolution 2025-0881 refers to the John T. Alsop Jr. Bridge, commonly known as the Main Street Bridge, on the January 13, 2026 Council agenda.

How big is the Main Street Bridge lift span?

FDOT records the Main Street Bridge as 1,680 feet long in 14 spans, with a 365-foot central lift span and steel lift towers that rise to 200 feet.

The FDOT report breaks the 14 spans into 11 steel girder spans and 3 Warren through truss spans. The lift mechanism runs on a span drive system on the movable span, and the towers house the concrete counterweights. It is the largest of the four remaining vertical lift bridges in Florida and remains operable.

Florida's four remaining vertical lift bridges in FDOT's historic bridge inventory
FDOT No.County and crossingBuiltBuilderMain span (ft)Length (ft)
720022Duval, Main Street over the St. Johns River1941Mt. Vernon Bridge Co.3651,680
100920Hillsborough, Hillsborough River1939/1999Cone Brothers83359
120001Lee, Billy Creek1941C.T. Felix Const. Co.42116
874129Miami-Dade, Miami Canal1927/1954Champion Bridge Co.110110

Only two of the four still operate, according to the same FDOT report: the Main Street Bridge over the St. Johns River in Jacksonville and the Hillsborough River Lift Bridge, which was built in 1939 and reconstructed in 1999. That makes the Jacksonville span not only the longest lift in the state but one of only two working highway lift bridges left in Florida's historic inventory.

When does the Main Street Bridge open for boats?

The Main Street drawspan over the St. Johns River in Jacksonville must open on signal for vessels, except during morning and evening rush periods on most days.

Under 33 CFR 117.325, the Coast Guard's drawbridge rule for the St. Johns River, the Main Street drawbridge at mile 24.7 must open on signal, except that from 7 a.m. to 8:30 a.m. and from 4:30 p.m. to 6 p.m., Monday through Saturday except federal holidays, the drawspan need not be opened for the passage of vessels. On Sundays and federal holidays the on-signal rule applies all day.

The same St. Johns River rule covers the Florida East Coast automated railroad bridge at mile 24.9, which is normally left fully open with flashing green lights and lowers only when a train approaches. For drivers and walkers, the practical tip is that a raised Main Street span is least likely during the weekday rush windows, when the federal rule lets the bridge stay down.

What closures and historic listing plans affect the bridge?

Southbound lanes and the southbound walkway are reduced or closed through January 30, 2027, for Riverfront Plaza work, and City Council has asked for a National Register nomination.

The City of Jacksonville's August 7, 2026 notice says that beginning August 24, 2026, southbound lanes toward Riverplace Boulevard are reduced to one lane and the southbound pedestrian walkway is closed for the Riverfront Plaza Main Street Bridge Nub Removal Project, led by the Department of Public Works with contractor The Haskell Company. Northbound traffic stays open with two lanes, and completion is anticipated by January 30, 2027. The city calls the work the first step toward a permanent pedestrian connection from the bridge to the new Riverfront Plaza, part of the plaza's second phase. FDOT District 2's North Florida road and lane closure report lists the same continuous southbound lane and walkway closures on Bridge No. 720022 through Jan. 30, 2027.

A follow-up city notice of August 25, 2026 explains that crews are removing the remnants of the old ramp from the Landing area to build a walkway connecting Riverfront Plaza to the bridge. When both southbound lanes closed overnight on August 27 to install a barrier wall, traffic was detoured west on Bay Street, south on Jefferson Street and over the Acosta Bridge, the route drivers bound for San Marco can use whenever Main Street is backed up.

The National Register request is newer than FDOT's eligibility finding. The Council record for January 13, 2026 shows Resolution 2025-0881 approved 18-0, expressing strong support for nominating the bridge for listing and encouraging the Planning Department, the Jacksonville Historic Preservation Commission and the Department of Public Works to collaborate on a nomination submittal. The Rules Committee approved it 7-0 on January 5, 2026.

Last verified: October 18, 2026, against FDOT's Historic Highway Bridges of Florida report and District 2 closure report, 33 CFR 117.325, the City of Jacksonville's two August 2026 closure notices, and the Council's January 13, 2026 meeting record.

Frequently asked questions

Why is it called the Main Street Bridge if its name is the Alsop Bridge?

Its formal name is the John T. Alsop Jr. Bridge, but City Council records describe it as commonly known as the Main Street Bridge, and city, FDOT and Coast Guard documents use that name.

How old is the Main Street Bridge?

FDOT dates it to 1941, so it reached 85 years in 2026. FDOT found it eligible for the National Register in its 2000 survey.

How long is the Main Street Bridge lift span?

FDOT records a 365-foot central lift span in a 1,680-foot bridge, with lift towers that rise to 200 feet. It is the largest of Florida's four remaining vertical lift bridges.

When does the Main Street Bridge open for boats?

Federal rule 33 CFR 117.325 says it opens on signal, except from 7 to 8:30 a.m. and 4:30 to 6 p.m. Monday through Saturday, excluding federal holidays, when it need not open.

Is the Main Street Bridge closed in 2026?

It is partly closed. Since August 24, 2026, southbound traffic is down to one lane and the southbound walkway is closed for Riverfront Plaza work, with completion anticipated by January 30, 2027.

Sources

  1. The Historic Highway Bridges of Florida, 2010 Update (Florida Department of Transportation) https://www.fdot.gov/docs/default-source/environment/pubs/Historic-Highway-Bridges-of-Florida-2010-Update.pdf Used for: bridge number, 1941 date, builder, cost and materials, 1935 vote, 1938 federal share, dimensions, NRHP eligibility, lift bridge table
  2. 33 CFR 117.325 St. Johns River (eCFR) https://www.ecfr.gov/current/title-33/chapter-I/subchapter-J/part-117/subpart-B/section-117.325 Used for: mile 24.7, opening rules and rush-hour exceptions, FEC railroad bridge
  3. Meeting of City Council on 1/13/2026 (City of Jacksonville Legistar) https://jaxcityc.legistar.com/MeetingDetail.aspx?GUID=B4E62095-5345-4D9E-81C4-E0A81EE4EAF6&ID=1317685&Options=&Search= Used for: Resolution 2025-0881 title and votes
  4. Main Street Bridge Pedestrian Walkway and Vehicular Lane Closure to Begin August 24 for Riverfront Plaza Improvements (City of Jacksonville, August 7, 2026) https://www.jacksonville.gov/welcome/featured-news/main-street-bridge-pedestrian-walkway-and-vehicular-lane-closure Used for: 2026 closure dates, scope, contractor, Riverfront Plaza connection
  5. North Florida Road and Lane Closure Report (FDOT District 2, October 16, 2026) https://www.nflroads.com/trafficreport Used for: Bridge 720022 southbound closures through Jan. 30, 2027
  6. Main Street Bridge Southbound Lanes Closed on Thursday Night, August 27 (City of Jacksonville, August 25, 2026) https://www.jacksonville.gov/welcome/featured-news/main-street-bridge-southbound-lanes-closed-on-thursday-night,-august-27 Used for: old ramp removal, overnight detour route
Last updated: October 18, 2026

How this page was made

Digital Towns uses AI assistance to research and write its guides, and every page is only as good as the sources it cites. Our goal is the most accurate, useful local information possible.

This page was fact-checked twice before publishing.

If you see an error, or anything you can show is false, tell us right away and we will take a third look.