Short answer: In Melbourne, building permits are issued by the Building Section of the Code Compliance Division on the second floor of City Hall, 900 East Strawbridge Avenue. Plans are filed through the EnerGov portal and reviewed first come, first served under the Florida Building Code, Eighth Edition (2023). Single-family jobs under $7,500 without electrical, plumbing, mechanical, gas or structural work may qualify for a written HB 803 exemption instead.
Who issues building permits in Melbourne?
Inside Melbourne city limits, building permits come from the Building Section, a unit of the Code Compliance Division rather than of Community Development. The section describes its job as permitting, review and inspection of construction to ensure compliance with building, electrical, mechanical and plumbing codes. Its counter is on the second floor of City Hall at 900 East Strawbridge Avenue, its phone line is 321-608-7900, and permit assistance runs Monday through Friday from 7:30 a.m. to 4 p.m. Contractor insurance certificate renewals go to the section by email at [email protected].
Melbourne permits are filed electronically. The Code Compliance Division states that applicants must submit plans through EnerGov, the city's permitting portal, and that plans are reviewed on a first come, first served basis. At the end of review a set is either approved for construction or returned to the designer for code-required corrections. EnerGov also holds each permit's list of required inspections, the inspector's contact details and the assigned plans examiner, and the city posts six instructional videos on using it.
Zoning comes first for many projects. The City of Melbourne's Developing in the City page describes a process that begins with the review of plans and ends with a Certificate of Occupancy or Certificate of Completion, and sets separate review thresholds for projects in the Downtown Melbourne and Olde Eau Gallie Riverfront redevelopment areas. Last verified: October 8, 2026, on the City of Melbourne website.
Which codes does the Melbourne Building Section apply?
The Building Section's notice to contractors states that the Florida Building Code, Eighth Edition (2023), including the 2020 National Electrical Code, became effective January 1, 2024. Because the Florida Building Commission adopts the code statewide, Melbourne does not vote it in; the version in force on the date an application is submitted governs that permit for its whole life, including extensions.
The city's Codes and Ordinances Enforced list spells out the full stack used in Melbourne: the 2023 Florida Building Code volumes for building, residential, existing buildings, energy conservation, fuel gas, mechanical, plumbing and accessibility; NFPA 70, the 2020 National Electrical Code; the Florida Fire Prevention Code, Seventh Edition (2020), with NFPA 101 and NFPA 1; Florida Statutes chapters on engineering, architecture, contracting, building standards, elevators and fire prevention; and the City of Melbourne Code of Ordinances. The same list names the agencies whose criteria a permit may touch, from the Melbourne Fire Department and city Engineering to Brevard County environmental and tax offices and the U.S. Army Corps of Engineers.
Melbourne adds one local requirement of its own. Effective October 1, 2018, a completed Outdoor Lighting Certification Form must be submitted before final inspection for new or replacement outdoor light fixtures, with one and two family homes and townhouses exempt.
Can Melbourne homeowners skip a permit for small jobs?
Since HB 803, Florida law at F.S. 553.79(1)(g) requires local building departments to exempt certain small jobs, and the Melbourne Building Section has written its own procedure for it. The exemption applies only when every condition holds: the property is a single-family dwelling, the total value of the work is less than $7,500, the property is outside a designated flood hazard area, and the work involves no electrical, plumbing, mechanical, gas or structural scope. Projects may not be split or phased to slip under the threshold.
The exemption is not automatic in Melbourne. The owner or contractor files an Exemption Request in EnerGov before work starts, with parcel and owner information, a notarized request on the city form describing the scope and value, a copy of the contract or other proof of value, and an exemption review fee. If the city approves, the work proceeds without a building permit, and the signed acknowledgment means no after-the-fact permit will be issued later, even if an insurer, lender or buyer asks for one. If the city denies the request, the fee already paid is applied toward a building permit for the same work.
A separate category of Melbourne permits survives the exemption. City ordinance permits for fences, accessory structures, driveways, flatwork and similar work are not building permits, are not covered by HB 803 and remain required regardless of the value of construction, along with zoning and land development rules.
How do inspections work on a Melbourne permit?
Every permit issued by Melbourne carries a list of required inspections based on the approved plans. The Inspections page states that the Building Official examines permitted work through scheduled periodic inspections during construction and a final inspection on completion, and that work failing to comply must be corrected before it is covered. Inspections are typically performed between 7:45 a.m. and 4 p.m. The city does not give appointment times, but an inspector can be called at 321-608-7900 between 7:30 a.m. and 8 a.m. on inspection day, and each inspector's proposed route is posted online.
Melbourne has tightened its stance on skipped steps. The Building Section states that bypassed inspections have become more common over the past year. A bypassed inspection is now recorded as failed and a reinspection fee is charged; the permit holder must either expose the work or submit a detailed corrective action plan, and a basic engineer letter is not accepted. Repeated misses can bring a requirement to uncover completed work and referral to a state licensing board.
Two practical rules come from the same Melbourne pages. Contractors must provide inspector access to all roofs over one story, and on single-family homes an inspector asks permission before entering a house or fenced yard. The city also lists VuSpex virtual inspections as coming soon through EnerGov, beginning with certain residential permit types.
What fees, forms and alternatives apply in Melbourne?
The Building Section Forms page posts a Building Permit Fees schedule effective August 7, 2026, alongside the Notice of Commencement, the Owner Builder form, an After Hours Inspection Request form, the Outdoor Lighting Certification, the HB 803 Exemption Application and blower door testing forms for energy code compliance. Temporary Underground (TUG) requirements and an agreement form cover temporary underground service. Melbourne's planning and zoning charges, such as variances and site plans, sit on a separate Community Development fee schedule.
Owners in Melbourne may also use the state Private Provider program under F.S. 553.791, in which licensed professionals perform plan review or inspections instead of city staff. The city's Private Provider page states that plan review fee reductions apply only if the Notice to Building Official is submitted with the permit application, that inspection-only providers must file the notice before the first scheduled inspection, and that standard reductions apply to projects outside a FEMA Special Flood Hazard Area. No reductions or refunds are granted once a permit is issued.
Flood maps also bear on Melbourne permits, since the HB 803 exemption and Private Provider fee reductions both depend on flood zone status. The Code Compliance Division keeps Flood Zone Maps, Elevation Certificates and Letters of Map Revision on file at City Hall, and the city's Flood Hazard Information page reports that FEMA has issued a preliminary Flood Insurance Rate Map for Brevard County and incorporated areas, with a 90-day appeal period before the new determinations take effect.
Frequently asked questions
What phone number reaches the Melbourne Building Section?
The Building Section answers at 321-608-7900, Monday through Friday from 7:30 a.m. to 4 p.m. Field inspectors take calls from 7:45 a.m. to 4 p.m., and on inspection mornings between 7:30 and 8 a.m. for a rough time window.
Does Melbourne accept paper permit applications?
The Code Compliance Division states that applicants must submit plans through EnerGov, Melbourne's online permitting portal. HB 803 exemption requests are filed the same way, by choosing the Exemption Request application type and uploading a notarized request.
Is a fence permit needed in Melbourne for a cheap fence?
Yes. Melbourne treats fences, sheds and other accessory structures, driveways and flatwork as City Ordinance permits, which are separate from building permits and are not covered by the HB 803 exemption, so they remain required regardless of project value.
Which Florida Building Code edition applies in Melbourne?
The Florida Building Code, Eighth Edition (2023), with the 2020 National Electrical Code, took effect January 1, 2024. A Melbourne permit stays governed by whichever code edition was in force on the date its application was submitted.
Can a private inspector be used on a Melbourne project?
Yes. Melbourne recognizes the Private Provider program under F.S. 553.791. The Notice to Building Official must be filed with the application to get plan review fee reductions, or before the first inspection when a provider handles inspections only.
Sources
- Building Section, City of Melbourne https://www.melbourneflorida.org/Business/Building-Section Used for: role, hours, FBC 8th edition, HB 803 exemption, inspections policy, EnerGov
- Code Compliance Division, City of Melbourne https://www.melbourneflorida.org/Government/Departments/Code-Compliance-Division Used for: location, plan processing, flood zone maps
- Inspections, City of Melbourne Building Section https://www.melbourneflorida.org/Government/Departments/Code-Compliance-Division/Building-Section/Inspections Used for: inspection procedure, hours, VuSpex
- Private Provider Information, City of Melbourne https://www.melbourneflorida.org/Government/Departments/Code-Compliance-Division/Building-Section/Private-Provider-Information Used for: F.S. 553.791 program and fee reductions
- Codes & Ordinances Enforced, City of Melbourne https://www.melbourneflorida.org/Government/Departments/Code-Compliance-Division/Building-Section/Codes-Ordinances-Enforced Used for: codes in force
- Building Section Forms, City of Melbourne https://www.melbourneflorida.org/Government/Departments/Code-Compliance-Division/Building-Section/Building-Section-Forms Used for: fee schedule date and forms
- Flood Hazard Information, City of Melbourne https://www.melbourneflorida.org/Government/Departments/Code-Compliance-Division/Building-Section/Flood-Hazard-Information Used for: preliminary FIRM for Brevard County
- Developing in the City of Melbourne https://www.melbourneflorida.org/Government/Departments/Community-Development/Planning-Zoning/Developing-in-the-City-of-Melbourne Used for: development process ending in Certificate of Occupancy; CRA thresholds
