Building permits — Malabar, Florida

The Town of Malabar permits its own construction from Town Hall on Malabar Road, through an online portal and a two-day inspection week.


Short answer: The Town of Malabar issues its own building permits through the Building Department at Town Hall, 2725 Malabar Road, and every application goes through the town's online permitting portal; emailed and paper applications are refused. Fees from October 1, 2026 follow Resolution 12-2026 and are no longer based on project cost. The Building Official reviews plans on Tuesdays and Thursdays, inspections run only on those days, and a complete file can be approved in 7 to 10 days.

Last verified: October 13, 2026, against the sources listed at the end of this page.

Who issues building permits in Malabar?

The Town of Malabar Building Department issues building permits for work inside town limits from its office in Town Hall at 2725 Malabar Road (Town of Malabar).

Chapter 6 of the Malabar Code of Ordinances makes the permit mandatory: no building, structure or component regulated by the town may be erected, moved, added to or altered without a permit issued by the building official (Malabar Code, Sec. 6-4). Work that needs a permit and starts before one is issued costs double the permit fee or $100, whichever is greater, and that penalty is paid before that permit or any other permit at the same Malabar address is released (Malabar Code, Sec. 6-7).

The construction standard itself is state law. Section 6-1 of the Malabar code states that as of December 31, 2023, the Florida Building Code supersedes all local building codes, and the town lists the 2023 8th Edition volumes from Residential and Energy Conservation to Plumbing, Mechanical and Fuel Gas, along with the 2020 National Electric Code (Malabar Code, Sec. 6-1). The most recent amendment to that section is Ordinance 2024-01 of April 2024.

The office keeps a four-day week. The Malabar Building Department lists phone 321-727-7764, fax 321-727-9997 and hours of Monday through Thursday 8:30 am to 5 pm, so Friday is not among its posted hours (Town of Malabar). Last verified: October 13, 2026, on the Town of Malabar website.

How does a permit application move through the Malabar portal?

Every Malabar permit application is filed in the town's online permitting portal, because the Building Department no longer accepts emailed applications and stopped taking paper ones on May 1, 2024 (Town of Malabar).

The Malabar Building Department page spells out the portal steps. An applicant opens the portal, scrolls to the Building Permit Application section and selects Building Permit, and the next screen issues an Application/Permit number; land fill and land clearing permits sit under the Land Use Application section instead (Town of Malabar). Later searches use that number or the property address, and the View screen shows status, scheduled inspections, inspection results, notes, uploaded files and fees, which can be paid there by credit or debit card (Town of Malabar).

Uploads and inspection requests in the Malabar portal ask for an access code, which is sent to the email address the town has on file; anyone who never receives it is asked to email the Building Department and name the address the code should have reached (Town of Malabar).

Contractors must be current with Malabar before their name appears on an application. The Building Department warns that without an up to date business tax receipt, general liability, workers compensation and contractor license on file at the Town of Malabar, a permit cannot be issued (Town of Malabar). A contractor registers by filing a building permit under the class of work CONT-Contractor Registration and uploading the registration form with those documents, and the registration fee of $40 is a one-time payment (Town of Malabar FAQ).

The Malabar Building Permits and Forms page lists the companion documents a file may need, including a Brevard County Notice of Commencement, an owner-builder disclosure form, a notice to homeowner on use of a private provider, a pool barrier affidavit, a roof nail-in affidavit, product approval affidavits and a single family residence checklist, plus separate culvert-driveway, demolition, fill, road improvement and site plan applications (Town of Malabar).

What does a Malabar building permit cost from October 1, 2026?

Malabar building permit fees from October 1, 2026 follow Resolution 12-2026 and are no longer calculated from project cost; applicants pay processing fees plus the town's actual contracted plan review and inspection costs (Town of Malabar).

The Malabar fee page ties the change to Florida House Bill 399, which it describes as banning fees based on a percentage of construction cost or project valuation and requiring fees to match the reasonable direct and indirect costs of processing (Town of Malabar). Resolution 08-2026 revised the administrative and permit fees, and Resolution 12-2026 set the revised schedule effective October 1, 2026 (Town of Malabar).

Pass-through fees cover plan reviews, permit comment periods, requests for additional information, revisions, inspections and other steps handled by contracted services, and fees will be passed through to the applicant at the Town of Malabar's actual contract rates. Building Official and engineering time is tracked by permit number and billed lump sum or hourly, rounded up in quarter-hour increments (Town of Malabar).

When Malabar building permit charges are due (fees effective October 1, 2026)
Point in the Malabar permitWhat is paid
Submittal in the town portalApplication fees and pass-through deposits
Before the permit is issuedAll accumulated base fees and actual plan review fees
Before close-out or a Certificate of OccupancyAll actual inspection fees
Any online card paymentConvenience fee of 3.5% or $2.00, whichever is higher
Work started before the permitPermit fee doubled, or $100 if greater (Sec. 6-7)

Refunds in Malabar are narrow. The code allows no refund of permit fees after 30 calendar days from the date of issuance shown on the permit, and administrative and plan review fees are not refundable under any condition (Malabar Code, Sec. 6-6). The card convenience fee and the payment points in the table come from the town fee page (Town of Malabar).

How long does Malabar take to review a permit, and when are inspections?

A complete Malabar application can be approved in as little as 7 to 10 days, because the Building Official reviews submittals on Tuesdays and Thursdays (Town of Malabar FAQ).

State law sets the outer limit for Malabar. Section 553.792, Florida Statutes, gives a local government 30 business days after a complete and sufficient application to approve, approve with conditions or deny a permit for residential units under 7,500 square feet reviewed by its own plans reviewer, and it must tell the applicant within 5 business days what information is still needed (Florida Statutes). The Malabar FAQ puts the rule more simply, saying permits go out within 30 days once every required document is in and the permit is paid (Town of Malabar FAQ).

Inspections in Malabar are strictly held on Tuesdays and Thursdays. The request is made in the portal by finding the permit and choosing Request Inspection, and when the needed type is not listed the Building Department asks for the closest type with the work described (Town of Malabar). Results appear in the Inspections section of the permit record on the Malabarfl.Portal.Iworq.Net site (Town of Malabar FAQ).

The Town of Malabar publishes an inspection card for each common job, among them roof, shutters, window and door, HVAC change out, pool, pool resurface, screen enclosure, solar install, fence, driveway, culvert, water heater, garage door and tree removal, plus a Single Family Residence Inspection Guide and a Certificate of Occupancy checklist (Town of Malabar).

Plan requirements and the certificate of occupancy in Malabar

Malabar plans must show the survey and deed, lot dimensions, existing and proposed buildings, the well, sewer or disposal system and drainage, with one- and two-family floors at least 18 inches above the street crown (Malabar Code).

Section 6-4 of the Malabar code also requires a permit before fill is placed on any property within the town, engineer's sealed plans for all aluminum structures and swimming pools, and copies of all required outside agency permits. Before the foundation inspection, a registered land surveyor must provide a foundation survey showing compliance with the setbacks in Article III of the Malabar Land Development Code (Malabar Code, Sec. 6-4).

Builders and owners must repair any damage their work causes to Malabar roads, sidewalks, drainage facilities or other public rights-of-way, and the town may refuse further development permits to the responsible party until the damage is repaired (Malabar Code, Sec. 6-4). Driveway culverts and road improvements each have their own Town of Malabar application (Town of Malabar).

No new or altered building in Malabar may be used until the building official issues a certificate of occupancy, and a refusal after all final inspections pass must be explained to the owner in writing (Malabar Code, Sec. 6-9). Under Chapter 11, contractors certify in writing before a Malabar permit is issued that they will arrange cleanup and legal disposal of construction trash (Malabar Code, Sec. 11-9).

Two rules in the Malabar FAQ apply to common projects. A fence or wall between abutting parcels cannot be built, replaced or altered without a town permit, although periodic repair and maintenance of an existing fence needs none; and a trailer used during construction may stand only after a building permit is released and must be removed within ten days after construction ends (Town of Malabar FAQ).

Malabar Building Department workload in the 2025 report

The Town of Malabar's 2025 utilization report counts 535 building permit applications, 445 permits issued or approved and 1,079 inspections and reinspections conducted (Town of Malabar).

Section 553.80, Florida Statutes, requires a local government with a building fee schedule to post a building permit and inspection utilization report drawn from its most recently completed financial audit, and to update it before adjusting fees (Florida Statutes). Malabar's report lists six personnel dedicated to enforcing the Florida Building Code and 170 inspections conducted by a private provider (Town of Malabar).

Town of Malabar Building Permit and Inspection Utilization Report 2025
MeasureMalabar figure
Building permit applications submitted535
Building permits issued or approved445
Inspections and reinspections requested1,079
Inspections and reinspections conducted1,079
Inspections conducted by a private provider170
Personnel dedicated to the Florida Building Code6
Personnel services cost$253,969.74
Operating expenditures$45,702.78
Revenue from permit fees$209,228.38
Balance carried forward$179,458.86

Adding the two cost lines in the Malabar report, $253,969.74 for personnel and $45,702.78 for operating expenses, gives $299,672.52, against $209,228.38 in revenue from permit fees and $0 in fines; the report also shows $179,458.86 carried forward (Town of Malabar).

Frequently asked questions

Does Malabar accept paper building permit applications?

No. The Town of Malabar stopped accepting paper applications on May 1, 2024 and no longer takes emailed ones either, unless a form says otherwise. Applications arrive through the online permitting portal linked from the Building Department page, and anything sent another way is returned to the applicant.

What days does Malabar inspect construction?

Malabar holds building inspections only on Tuesdays and Thursdays, the same two days the Building Official reviews new applications. Inspections are requested in the town portal by searching for the permit and choosing Request Inspection, and results post to the permit record on the iWorq portal.

How much does contractor registration cost in Malabar?

Contractor registration with the Town of Malabar is a one-time $40 fee. The contractor files a building permit under the class of work CONT-Contractor Registration and uploads the registration form with a business tax receipt, general liability, workers compensation and a business license.

Are Malabar permit fees still based on construction value?

No. From October 1, 2026 the Town of Malabar charges permit application processing fees plus pass-through plan review and inspection fees at its actual contract rates, and its fee page says fees will no longer be calculated from project cost, citing Florida House Bill 399.

Can work start in Malabar before the permit is issued?

Not without a penalty. Under Section 6-7 of the Malabar code, work begun before a required permit doubles the permit fee or costs $100, whichever is greater, and the penalty is paid before that permit or any other permit at the same location is issued.

Sources

  1. Building Department, Town of Malabar https://www.townofmalabar.org/234 Used for: online portal only, no emailed or paper applications, portal steps, access code, contractor documents, Tuesday and Thursday inspections, Town Hall address, phone, fax, Monday to Thursday hours, convenience fee
  2. Building Department Fees: Effective 10/01/2026, Town of Malabar https://www.townofmalabar.org/235 Used for: Resolutions 08-2026 and 12-2026, House Bill 399, no valuation-based fees, pass-through fees at contract rates, quarter-hour billing, payment timing, 3.5% or $2.00 card fee
  3. Building Permit & Inspection Utilization Report 2025, Town of Malabar https://www.townofmalabar.org/236 Used for: 535 applications, 445 permits, 1,079 inspections, 170 private provider inspections, 6 personnel, costs, fee revenue, balance carried forward
  4. Building Permits & Forms, Town of Malabar https://www.townofmalabar.org/237/Building-Permits-Forms Used for: May 1, 2024 end of paper applications, list of permit applications, supporting documents and inspection cards
  5. Malabar FAQs, Town of Malabar https://www.townofmalabar.org/381/Malabar-FAQs Used for: Building Official review on Tuesdays and Thursdays, 7 to 10 day approvals, 30-day state rule as the town states it, $40 contractor registration, fence permits, construction trailers, iWorq inspection results
  6. Malabar Code of Ordinances, Chapter 6, Buildings and Building Regulations https://api.municode.com/CodesContent?jobId=459094&productId=11814&nodeId=PTIICOOR_CH6BUBURE Used for: Sec. 6-1 Florida Building Code adoption, Sec. 6-4 permits required and plan contents, 18-inch floor rule, fill permits, foundation survey, right-of-way repair, Sec. 6-6 refunds, Sec. 6-7 work without permit, Sec. 6-9 certificate of occupancy
  7. Malabar Code of Ordinances, Chapter 11, Nuisances https://api.municode.com/CodesContent?jobId=459094&productId=11814&nodeId=PTIICOOR_CH11NU Used for: Sec. 11-9 contractor certification of construction debris cleanup before a permit
  8. Section 553.792, Florida Statutes (2026), Building permit application to local government https://www.flsenate.gov/Laws/Statutes/2026/553.792 Used for: 30 business days to act on a complete residential application under 7,500 square feet; 5 business days to identify missing information