Stormwater and lagoon protection — Palm Bay, Florida

Palm Bay rain runs untreated to Turkey Creek and the lagoon, so the city polices its storm drains and owes FDEP the largest nutrient cut of any city in the central lagoon plan.


Short answer: Palm Bay protects the Indian River Lagoon through a Public Works stormwater program run under an FDEP MS4 permit: an illicit discharge ordinance, a rainy-season fertilizer ban, baffle boxes and ponds credited by FDEP, and septic-to-sewer plans. FDEP's April 2025 draft plan sets Palm Bay's required cut at 111,991 pounds of nitrogen a year. Discharges into Palm Bay storm drains are reported to the Public Works Hotline, (321) 952-3438, or Non-Emergency Police, (321) 952-3456, after hours.

Last verified: October 13, 2026, against the sources listed at the end of this page.

How does Palm Bay stormwater reach the Indian River Lagoon?

Most rain that falls on Palm Bay is collected in streets and catch basins and flows untreated into Turkey Creek or straight into the Indian River Lagoon.

The City of Palm Bay Public Works stormwater page states that Palm Bay sits inside the Indian River Lagoon Watershed and that the majority of its water reaches the lagoon through Turkey Creek or via direct discharge (City of Palm Bay Stormwater). The same page explains why that matters: runoff picks up debris, chemicals and sediment from Palm Bay streets, parking lots and roofs, and storm drains were designed to collect only rain and clean water runoff.

The legal frame is a federal permit. Palm Bay holds a National Pollutant Discharge Elimination System (NPDES) Phase II Municipal Separate Storm Sewer System (MS4) permit, which the Florida Department of Environmental Protection (FDEP) administers in Florida under authority it received from the EPA in October 2000 (City of Palm Bay Stormwater). Chapter 204 of the Palm Bay Code, passed as Ordinance 2024-42 on September 19, 2024, lists the regulatory mandates and programs Palm Bay stormwater management must meet, including the FDEP permit to operate an MS4, city-wide water quality monitoring, public outreach, the Illicit Discharge Ordinance (Chapter 95, Ordinance No. 2008-37), and management of Turkey Creek and the lagoon, including dredging and debris removal (Palm Bay Code Chapter 204). The fee itself, its ERU rate and its credits are a separate subject on the Palm Bay stormwater utility fee page.

How much nitrogen and phosphorus must Palm Bay cut?

FDEP's April 2025 draft Central Indian River Lagoon Basin Management Action Plan assigns the City of Palm Bay a required reduction of 111,991 pounds of nitrogen and 17,320 pounds of phosphorus a year, the largest of any city in that plan.

A Basin Management Action Plan, or BMAP, is the state's enforceable cleanup plan for a polluted water body. The City of Palm Bay's own January 18, 2024 council presentation explains that the lagoon's Total Maximum Daily Load (TMDL) was established by FDEP in March 2009, with a deadline of 2035 for achieving load reductions (Palm Bay BMAP presentation, page 4). Palm Bay's share is split across two FDEP project zones: 110,334 pounds of nitrogen in Project Zone A and 1,657 pounds in Project Zone SEB (FDEP draft Central IRL BMAP, Table 16).

Required annual reductions in the draft Central Indian River Lagoon BMAP, April 2025 (FDEP Tables 16 and 17)
EntityTotal nitrogen (lbs/yr)Total phosphorus (lbs/yr)
City of Palm Bay111,99117,320
Brevard County47,9278,448
City of Melbourne33,9215,182
City of Sebastian33,1966,015
Town of Malabar12,3861,910

Phosphorus follows the same pattern, with 17,041 pounds of Palm Bay's 17,320 pound phosphorus target falling in Project Zone A (FDEP draft Central IRL BMAP, Table 17). Growth adds pressure on top of the target. FDEP's Table 23 projects 17,370 additional Palm Bay residents by 2040 and estimates the extra nitrogen they would bring at 9,803 pounds a year under the best-case scenario and 40,358 pounds under the status quo scenario (FDEP draft Central IRL BMAP, Table 23). Both figures are the highest for any local government in the table.

Which Palm Bay projects count toward the lagoon targets?

The draft BMAP lists City of Palm Bay projects numbered PB-01 through PB-50, including Boundary Canal retention, the Basin 3 Main Street treatment train, Turkey Creek baffle boxes finished in 2024 and six more lagoon baffle boxes planned for 2026.

Among structures Palm Bay built itself, the largest measured credit belongs to Boundary Canal Phase II, an on-line retention project completed in 2014 that FDEP credits with 3,276 pounds of nitrogen and 383 pounds of phosphorus a year (FDEP draft Central IRL BMAP, page 90). The biggest credit of all goes to Palm Bay's education program, which FDEP lists as FYN, ordinances, pamphlets, PSAs, the website and the illicit discharge program, credited at 12,343 pounds of nitrogen and 1,787 pounds of phosphorus (FDEP draft Central IRL BMAP, page 91).

Selected City of Palm Bay projects in the draft Central IRL BMAP, April 2025 (FDEP pages 90 to 92)
ProjectTypeStatusTN / TP credit (lbs/yr)
Boundary Canal Phase IIOn-line retentionCompleted 20143,276 / 383
Basin 3 Main Street ImprovementsTreatment trainCompleted 20101,604 / 231
Basin 3 Main Street Parking LotPervious pavementCompleted 20081,428 / 206
Port Malabar Unit 40 NorthWet detention pondCompleted 2015737 / 182
Street sweepingStreet sweepingOngoing57 / 36
Goode ParkBaffle boxes with mediaCompleted 2023TBD
Turkey Creek Baffle Box Treatment Train (22PW10)Treatment trainCompleted 2024TBD
IRL 6 Baffle BoxesBaffle boxes with mediaPlanned 2026TBD
Stormwater Treatment at City MarinaTreatment trainPlannedTBD

The Goode Park project installed nutrient separating baffle boxes at two Palm Bay drainage outfalls and is listed at $588,000; the City Marina system, a baffle box with modular wetlands and an upward filter, is listed at $890,050, and a second-generation Norwood Baffle Box Retrofit is planned for 2028 (FDEP draft Central IRL BMAP, page 92). The 22PW10 Turkey Creek Baffle Box Treatment Train, completed in 2024 at $1,500,000, put nutrient separating baffle boxes at five Palm Bay outfalls serving basins 3, 6 and 7, and the IRL 6 Baffle Boxes project ($1,500,000) and a $1,800,000 Robert J Conlan Pond retrofit are both planned for 2026 (FDEP draft Central IRL BMAP, page 94). Older Turkey Creek work also appears: maintenance dredging completed in 2007 is listed at $255,241 (FDEP draft Central IRL BMAP, page 91). Current culvert and pond schedules are tracked on the Palm Bay drainage improvement projects page.

How is an illicit discharge reported in Palm Bay?

Palm Bay takes illicit discharge reports on the Public Works Hotline at (321) 952-3438 during the day, through Non-Emergency Police at (321) 952-3456 after hours, or by the city online form, and callers may stay anonymous.

The Palm Bay Report Illicit Discharge page uses the federal definition: any discharge to an MS4 that is not composed entirely of stormwater (Palm Bay Report Illicit Discharge). It sorts them into three kinds. A transitory discharge is a one-time spill, dump or leak; an intermittent one recurs for hours a day or days a year; a continuous one comes from an illegal connection, a sanitary sewer link or a failing septic system, and the city calls that last kind the easiest to trace and potentially the largest pollutant load.

The signs Palm Bay asks residents to report are unusual color or cloudiness, a strong pungent or musty odor, floating debris, surface scum or foam, an oil sheen and algae (Palm Bay Report Illicit Discharge). The city's printed illicit discharge brochure gives a different number, Customer Service at 321-952-3437, and directs reports to Public Works at 1050 Malabar Rd SW (Palm Bay illicit discharge brochure); the Palm Bay stormwater page also lists 321-952-3437 as the Public Works number.

Enforcement sits in the city code. Under Sections 95.20 to 95.99, a responsible party may receive a Notice of Violation, be fined for administrative, inspection and remediation costs, and be required to put Best Management Practices in place at its own expense (Palm Bay illicit discharge brochure). The brochure's examples include septic tank effluent, car wash waste water, laundry waste water and leaves and grass clippings (Palm Bay illicit discharge brochure, page 2). Last verified: October 12, 2026, on the City of Palm Bay Public Works stormwater and illicit discharge pages.

What fertilizer and household rules apply in Palm Bay?

Palm Bay's Fertilizer Ordinance 2014-16 bans nitrogen and phosphorus fertilizer on lawns from June 1 to September 30 and keeps all fertilizer at least 10 feet from ponds, canals, ditches, creeks and the river.

The rainy-season window exists because afternoon thundershowers can wash fertilizer into storm drains and groundwater that carry it toward the Indian River Lagoon, where it can feed algae blooms that shade out seagrass (City of Palm Bay Stormwater). Outside that window, the Palm Bay ordinance allows no phosphorus without a soil or tissue test showing a need, and any nitrogen product must be at least 50 percent slow release. A label such as 0-0-27 carries no nitrogen or phosphorus and may be used in summer, except in the 10-foot buffer. Lawn professionals need Green Industry Best Management Practice certification, and the ordinance gives two warnings before fines.

Household rules come from the same Palm Bay Public Works program. A pool should not be drained unless a test kit shows zero chlorine, and never into the storm sewer, a canal or a waterway (Palm Bay illicit discharge brochure). The Report Illicit Discharge page asks that washing machines drain to the sanitary sewer rather than a Palm Bay yard or ditch, that cars be washed on grass or at a commercial car wash, and that paint, solvents and used oil go to the County Hazardous Waste Facility (Palm Bay Report Illicit Discharge).

How does septic fit into Palm Bay's lagoon plan?

Palm Bay's 2024 BMAP remediation plan counts 27,780 septic systems in the city and prices the full fix, from sewer connections to septic upgrades and a treatment plant upgrade, at $665 million.

The City of Palm Bay presentation to City Council on January 18, 2024 found that only 729 of those 27,780 systems were the enhanced nutrient-reducing type (Palm Bay BMAP presentation, page 8). It identified 3,333 homes for septic-to-sewer conversion at an estimated $150 million, including 1,066 connections in Port Malabar Units 7, 8, 9 and 13 (ongoing) and 99 in a Turkey Creek area labeled as a Brevard County SOIRL area, with design to start (Palm Bay BMAP presentation, page 10). The remaining 23,718 systems would need upgrades estimated at $500 million (Palm Bay BMAP presentation, page 11).

Treatment plants are part of the same Palm Bay plan. The North Regional Water Reclamation Facility was upgraded to nutrient removal in 2022 with $3.6 million from the Brevard County SOIRL lagoon program (Palm Bay BMAP presentation, page 13), and the plan's total, including $15 million for a wastewater plant upgrade, is $665 million (Palm Bay BMAP presentation, page 15).

State law sets the deadline for Palm Bay owners. Under section 373.469, Florida Statutes, any home or business with an existing septic system inside the Central Indian River Lagoon BMAP area must connect to central sewer if available, or upgrade to a system achieving at least 65 percent nitrogen reduction, by July 1, 2030 (Florida Statutes 373.469). Connection steps and fees are covered on the Palm Bay page on connecting to city water and sewer.

Frequently asked questions

Where does Palm Bay stormwater go?

Most of it reaches the Indian River Lagoon through Turkey Creek or by direct discharge. The City of Palm Bay says this runoff is not treated before it reaches the water, which is why the city restricts what may enter its storm drains.

What number reports a discharge into a Palm Bay storm drain?

The Palm Bay Public Works Hotline at (321) 952-3438 in the daytime, or Non-Emergency Police at (321) 952-3456 after hours. The city also runs an online reporting form, and reports may be made anonymously.

When does the Palm Bay fertilizer ban apply?

From June 1 to September 30 each year, Palm Bay Ordinance 2014-16 bars fertilizer containing nitrogen or phosphorus on established lawns. Products with neither nutrient, such as a 0-0-27 blend, remain allowed, but never within 10 feet of a water body.

Where has Palm Bay installed lagoon baffle boxes?

FDEP's April 2025 draft plan lists nutrient separating baffle boxes at two Goode Park outfalls (2023) and at five Palm Bay outfalls in basins 3, 6 and 7 under the Turkey Creek treatment train (2024), with six more lagoon baffle boxes planned for 2026.

Can a pool be drained into a Palm Bay canal?

No. City guidance says a pool should not be drained until a test kit shows zero chlorine, and pool water should never go into the storm sewer system, a canal or a waterway in Palm Bay.

Sources

  1. City of Palm Bay Public Works, Stormwater https://www.palmbayfl.gov/government/city-departments-f-to-z/public-works/stormwater Used for: watershed, Turkey Creek, MS4 and NPDES Phase II permit, fertilizer Ordinance 2014-16
  2. City of Palm Bay, Report Illicit Discharge https://www.palmbayfl.gov/government/city-departments-f-to-z/public-works/stormwater/report-illicit-discharge Used for: definition and types, warning signs, hotline numbers, anonymous reporting
  3. City of Palm Bay illicit discharge brochure, page 1 https://www.palmbayfl.gov/home/showpublisheddocument/25537/637922648415670000#page=1 Used for: customer service number, Sections 95.20 to 95.99, Notice of Violation, pool rule, Public Works address
  4. City of Palm Bay illicit discharge brochure, page 2 https://www.palmbayfl.gov/home/showpublisheddocument/25537/637922648415670000#page=2 Used for: examples of illicit discharge
  5. FDEP Draft Central Indian River Lagoon BMAP, April 2025, page 56 (Table 16) https://floridadep.gov/sites/default/files/250430_Draft_CIRL_BMAP.pdf#page=56 Used for: Palm Bay total nitrogen required reduction
  6. FDEP Draft Central Indian River Lagoon BMAP, April 2025, page 57 (Table 17) https://floridadep.gov/sites/default/files/250430_Draft_CIRL_BMAP.pdf#page=57 Used for: Palm Bay total phosphorus required reduction
  7. FDEP Draft Central Indian River Lagoon BMAP, April 2025, page 76 (Table 23) https://floridadep.gov/sites/default/files/250430_Draft_CIRL_BMAP.pdf#page=76 Used for: Palm Bay 2040 added population and nitrogen load scenarios
  8. FDEP Draft Central Indian River Lagoon BMAP, April 2025, page 90 https://floridadep.gov/sites/default/files/250430_Draft_CIRL_BMAP.pdf#page=90 Used for: Palm Bay projects PB-05 to PB-15
  9. FDEP Draft Central Indian River Lagoon BMAP, April 2025, page 91 https://floridadep.gov/sites/default/files/250430_Draft_CIRL_BMAP.pdf#page=91 Used for: Palm Bay projects PB-16 to PB-29, education credit
  10. FDEP Draft Central Indian River Lagoon BMAP, April 2025, page 92 https://floridadep.gov/sites/default/files/250430_Draft_CIRL_BMAP.pdf#page=92 Used for: Goode Park baffle boxes, City Marina, Norwood retrofit
  11. FDEP Draft Central Indian River Lagoon BMAP, April 2025, page 93 https://floridadep.gov/sites/default/files/250430_Draft_CIRL_BMAP.pdf#page=93 Used for: Turkey Creek shoreline restoration, SOIRL credit split
  12. FDEP Draft Central Indian River Lagoon BMAP, April 2025, page 94 https://floridadep.gov/sites/default/files/250430_Draft_CIRL_BMAP.pdf#page=94 Used for: Turkey Creek Baffle Box Treatment Train, IRL 6 Baffle Boxes, Robert J Conlan Pond
  13. City of Palm Bay BMAP remediation plan presentation, January 18, 2024, page 4 https://www.palmbayfl.gov/home/showpublisheddocument/26868/638429862241970000#page=4 Used for: TMDL established March 2009, 2035 deadline
  14. City of Palm Bay BMAP remediation plan presentation, page 8 https://www.palmbayfl.gov/home/showpublisheddocument/26868/638429862241970000#page=8 Used for: septic inventory
  15. City of Palm Bay BMAP remediation plan presentation, page 10 https://www.palmbayfl.gov/home/showpublisheddocument/26868/638429862241970000#page=10 Used for: septic to sewer conversion areas
  16. City of Palm Bay BMAP remediation plan presentation, page 11 https://www.palmbayfl.gov/home/showpublisheddocument/26868/638429862241970000#page=11 Used for: systems to upgrade and cost
  17. City of Palm Bay BMAP remediation plan presentation, page 13 https://www.palmbayfl.gov/home/showpublisheddocument/26868/638429862241970000#page=13 Used for: North Regional Water Reclamation Facility upgrade
  18. City of Palm Bay BMAP remediation plan presentation, page 15 https://www.palmbayfl.gov/home/showpublisheddocument/26868/638429862241970000#page=15 Used for: total remediation cost
  19. Palm Bay Code of Ordinances, Chapter 204 Stormwater Management Utility https://codelibrary.amlegal.com/codes/palmbay/latest/palmbay_fl/0-0-0-73749 Used for: MS4 permit, Illicit Discharge Ordinance Chapter 95 (Ordinance 2008-37), Turkey Creek and lagoon management
  20. Florida Statutes section 373.469 (2025), Indian River Lagoon Protection Program https://www.flsenate.gov/Laws/Statutes/2025/373.469 Used for: septic rules from January 1, 2024 and July 1, 2030
Last updated: October 13, 2026