Howard Frankland Bridge — Tampa, Florida

Named for a Tampa banker and chamber president, the I-275 crossing opened in 1960 and was rebuilt by FDOT with express lanes and a trail by 2026.


Short answer: The Howard Frankland Bridge carries I-275 across Old Tampa Bay between Tampa and St. Petersburg. Named for Tampa banker Howard Frankland, it opened in January 1960, and a parallel span followed in 1990. FDOT opened a new southbound bridge in March 2025, removed the 1960 span, and opened express lanes and a shared-use path in 2026, with 50-cent SunPass tolls from August 22, 2026.

What is the Howard Frankland Bridge?

The Howard Frankland Bridge carries Interstate 275 across Old Tampa Bay between Tampa and St. Petersburg, and it is the busiest of the bay's crossings. WUSF reported in May 2026 that an estimated 250,000 motorists use it daily, according to the Florida Department of Transportation. The original bridge opened in 1960, a second span followed in 1990, and between 2020 and 2026 FDOT built a new bridge that replaced the 1960 structure and added tolled express lanes and a trail.

The Tampa end of the project reaches State Road 60. FDOT's project page gives the limits of the rebuild as 4th Street in Pinellas County to State Road 60 in Hillsborough County, a length of 5.8 miles, with a construction cost of $973.4 million.

Who was Howard Frankland?

The bridge is named for a Tampa businessman, not a public engineer. Hillsborough County describes Howard Frankland, who lived from 1901 to 1980, as a prominent Hillsborough County entrepreneur, banker and philanthropist. As proprietor of Pioneer Tire Company in Tampa he studied rubber and developed ways to recap tires and make floor mats and rubber balls. He served as president of the First National Bank of Tampa and of the Greater Tampa Chamber of Commerce, and he worked to attract MacDill Air Force Base and to build a third bridge across Tampa Bay.

That third bridge was his long campaign. The county states that Frankland advocated a cross-bay span between the Gandy Bridge and the Courtney Campbell Causeway, and that he sat on the State Road Board when the Greater Tampa Chamber of Commerce suggested naming the new bridge for him. At the opening ceremony in January 1960, attended by Gov. LeRoy Collins, Frankland said he hoped the bridge would be a real tie of friendship linking Hillsborough and Pinellas counties, as the St. Petersburg Times reported at the time.

Why was the 1960 Howard Frankland Bridge replaced?

For three decades the 1960 bridge carried traffic in both directions. Hillsborough County records that it became the northbound span when a second, parallel bridge for southbound traffic opened in 1990. By the 2010s the older structure was wearing out. WUSF reported in March 2025 that FDOT considered the 1960 span a victim of saltwater corrosion that required cost-prohibitive maintenance, and that the state announced replacement plans in 2013. FOX 13 reports that FDOT announced the replacement project in 2017, and both outlets date the start of construction to 2020.

The replacement Howard Frankland design differs from its predecessors. WUSF reported that the new bridge was built with improved concrete and metals intended to resist saltwater, giving it an estimated 100-year lifespan, and that it includes infrastructure to handle a rail system. In May 2026 WUSF added that the new bridge stands taller than the older spans so that storm surge is less likely to spill onto the roadway during tropical storms or hurricanes.

The new southbound span opened to traffic in March 2025. WUSF described the switch as the end of more than a decade of planning and four years of construction on an eight-lane span over Old Tampa Bay. FOX 13 published photos of the span after it opened on March 25, 2025. FDOT's project page states that the 1990s Howard Frankland Bridge was then converted to carry northbound traffic, while the original 1960s bridge was removed. WUSF reported in May 2026 that final work to remove the original bridge had been completed.

How do the Howard Frankland express lanes work?

The new bridge between Tampa and St. Petersburg carries four general-use lanes in each direction, with two express lanes each way in the median. FDOT states that the express lanes extend from 4th Street North in St. Petersburg to just north of the bridge in Tampa, separated from the general-use lanes by barrier walls and flexible plastic poles. Only passenger vehicles, registered vanpools and buses are allowed in the I-275 express lanes.

The express lanes opened in stages. WUSF reported that FDOT opened the northbound express lanes early on May 27, 2026, with the southbound express lanes following within days, and that the express lanes increase bridge capacity by 50%. According to FDOT, as of August 22, 2026 tolls are collected electronically 24 hours a day, seven days a week, through the SunPass Prepaid Toll Program. WUSF and 83 Degrees Media report a toll of 50 cents per trip, with no toll-by-plate option.

83 Degrees Media, quoting FDOT, explains how drivers use the lanes. Southbound I-275 motorists can enter the express lanes just north of the Howard Frankland Bridge in Tampa and stay in them into St. Petersburg, merging back before the 4th Street North exit. Northbound drivers can enter just north of 4th Street North, cross Old Tampa Bay in the express lanes, and merge back into the general-use lanes just north of the bridge in Tampa.

FDOT also posted a 65 MPH speed limit across the Howard Frankland Bridge effective August 22, 2026, with a reduced 55 MPH limit on either side of the bridge during nearby construction. The contractor for the bridge project is the Archer Western and Traylor Bros joint venture.

Can people walk or bike across the Howard Frankland Bridge?

The rebuilt crossing between Tampa and St. Petersburg also serves people on foot and on bicycles. FDOT describes a 12-foot-wide, barrier-separated shared-use path on the north side of the new bridge, nearly seven miles long, with four shaded, sail-adorned overlooks above Old Tampa Bay. The path is open daily from sunrise to sunset.

Access on the Tampa side is at the south end of Reo Street, with the St. Petersburg access at the north end of 4th Street. 83 Degrees Media reported that the Westshore Alliance hosted a ribbon-cutting for the trail at the Reo Street trail head on June 6, 2026. FDOT states that additional connections at Ulmerton Road in Pinellas County and at Reo Street in Tampa are being built under separate projects.

How much traffic and money does the bridge involve?

Project cost figures for the Howard Frankland rebuild changed over time. WUSF and FOX 13 cited $865 million when the southbound span opened in March 2025. By May 2026 WUSF reported a total of $973 million and linked its own reporting that the project had risen more than $100 million over budget, and FDOT's project page lists $973.4 million.

Traffic estimates also vary by source. WUSF, citing FDOT, puts daily use at about 250,000 drivers. FOX 13 quoted an FDOT project manager in 2025 saying about 200,000 people use the bridge every day, more than the Courtney Campbell Causeway, the Gandy Bridge and the Sunshine Skyway combined. WUSF reported in 2025 that the Howard Frankland carries the most traffic by far of the three spans across Old Tampa Bay.

Frequently asked questions

When did the original Howard Frankland Bridge open?

Hillsborough County dates the opening ceremony to January 1960, with Gov. LeRoy Collins attending. WUSF gives 1959 as the year the original bridge was built. The 1960 span was removed after the new bridge opened in 2025.

How much is the toll on the Howard Frankland express lanes?

WUSF and 83 Degrees Media report a 50-cent toll per trip. FDOT says tolls have been collected electronically around the clock since August 22, 2026 through the SunPass Prepaid Toll Program, and the general-use lanes remain free.

Where does the Howard Frankland trail start in Tampa?

FDOT lists the Tampa access point at the south end of Reo Street. The St. Petersburg end connects at the north end of 4th Street. The path is open from sunrise to sunset.

Which vehicles can use the I-275 express lanes on the bridge?

FDOT allows only passenger vehicles, registered vanpools and buses in the express lanes. The lanes sit in the median between Tampa and St. Petersburg and are separated from the general-use lanes by barrier walls and flexible poles.

Why is the new Howard Frankland Bridge taller?

WUSF reported in May 2026 that the new bridge was built taller than its predecessors so storm surge is less likely to spill onto the roadway during tropical storms or hurricanes crossing Old Tampa Bay.

Sources

  1. Faces Behind the Places: Howard Frankland Bridge, Hillsborough County https://hcfl.gov/about-hillsborough/history/faces-behind-the-places/faces-behind-the-places-howard-frankland-bridge Used for: Frankland biography, naming, January 1960 opening, 1990 second span
  2. The new Howard Frankland Bridge from Tampa to St. Petersburg is slated to open, WUSF (March 19, 2025) https://wusf.org/text/transportation/2025-03-19/new-howard-frankland-bridge-tampa-st-petersburg-slated-open-tuesday Used for: $865 million, eight lanes, 250,000 daily drivers, saltwater corrosion, 100-year lifespan, 2013 plans, 2020 construction
  3. New span of Howard Frankland Bridge opens to traffic, FOX 13 (2025) https://www.fox13news.com/news/new-span-howard-frankland-bridge-opens-traffic Used for: opening March 2025, 2017 announcement, capacity increase, daily users
  4. I-275 (Howard Frankland Bridge) new southbound bridge, FDOT Tampa Bay project 422904-2-52-01 https://www.fdottampabay.com/project/417/422904-2-52-01 Used for: limits, length, cost, contractor, express lanes, Aug. 22, 2026 tolls, shared-use path, Reo Street access, conversion and removal of older spans
  5. Northbound express lanes, shared-use path are open on the Howard Frankland Bridge, WUSF (May 27, 2026) https://wusf.org/text/transportation/2026-05-27/northbound-express-lanes-howard-frankland-bridge-now-open Used for: 50-cent toll, $973 million, May 2026 openings, storm surge height, original span removal
  6. Howard Frankland shared-use path, express toll lanes open, 83 Degrees Media (June 4, 2026) https://83degreesmedia.com/howard-frankland-shared-use-path-express-toll-lanes-open/ Used for: Reo Street trail head ribbon-cutting, no toll-by-plate, path details
  7. U.S. Census Bureau American Community Survey 2023 https://www.census.gov/programs-surveys/acs Used for: Tampa population and demographic figures, ACS 2023
Last updated: October 8, 2026