Short answer: St. Johns Heritage Parkway is a partly built Palm Bay arterial meant to run from an I-95 diverging diamond interchange just north of Micco Road, opened August 11, 2020, to I-95 at Ellis Road. Built pieces run from that interchange to Babcock Street and from Malabar Road north past Emerson Drive and U.S. 192; the stretch between Babcock Street and Malabar Road, about 14 miles, is unbuilt and unfunded.
Last verified: October 12, 2026, against the sources listed at the end of this page.
What is the St. Johns Heritage Parkway in Palm Bay?
St. Johns Heritage Parkway is a partly built arterial through Palm Bay that reaches I-95 near Micco Road and again at Ellis Road (City of Palm Bay; city notice).
Its southern improvement program is a joint effort of the City of Palm Bay, Brevard County and FDOT (City of Palm Bay parkway page).
The road exists today in separate pieces. At the south end, an FDOT interchange on Interstate 95 just north of Micco Road feeds a parkway section that runs to Babcock Street near Davis Lane (City of Palm Bay parkway page). In the middle of the city, the parkway runs north from Malabar Road past Emerson Drive as a two-lane undivided road (City of Palm Bay widening page). At the north end it crosses U.S. 192 and continues as St. Johns Heritage Parkway/Ellis Road to the southbound I-95 entrance ramp (City of Palm Bay notice).
Between Babcock Street and Malabar Road there is no parkway yet. Brevard County Public Works studied that missing link and describes its Alternative Corridor Evaluation as a search for new roadway corridors that could connect the existing segments of the St. Johns Heritage Parkway (Brevard County Public Works).
Where does the St. Johns Heritage Parkway go?
From south to north, the parkway runs from the Micco Road area interchange to Babcock Street, breaks for an unbuilt gap, then resumes at Malabar Road and runs through Palm Bay to U.S. 192 and Ellis Road (Space Coast TPO needs list; city notice).
| Segment | Status | Source |
|---|---|---|
| I-95 interchange just north of Micco Road | Open, ribbon cutting August 11, 2020 | City of Palm Bay |
| Interchange to Babcock Street near Davis Lane | Open, 1.67 miles | City of Palm Bay |
| Babcock Street to Malabar Road | Not built, about 14 miles studied | Brevard County |
| Malabar Road to north of Emerson Drive | Open, two-lane undivided | City of Palm Bay |
| Malabar Rd to US 192 | Widening to 4 lanes listed as a need, 6.09 miles | Space Coast TPO |
| U.S. 192 north to I-95 at Ellis Road | Open, I-95 and Ellis Road interchange built in 2020 | Brevard County |
The two agencies measure the gap differently. Brevard County puts the study area from Babcock Street to Malabar Road at approximately 14 miles (Brevard County ACE), while the Space Coast Transportation Planning Organization lists a new St. Johns Heritage Pkwy S roadway from Babcock St to Malabar Rd at 13.39 miles (Space Coast TPO Advance 2050, Appendix F). Both figures describe the same unbuilt Palm Bay stretch between Babcock Street and Malabar Road.
What is the I-95 interchange at St. Johns Heritage Parkway SE?
The southern I-95 interchange is an FDOT diverging diamond at St. Johns Heritage Parkway SE, just north of Micco Road, opened with a ribbon cutting on August 11, 2020 (City of Palm Bay).
The City of Palm Bay says the parkway connects the new interchange to Babcock Street near Davis Lane, providing southeast Palm Bay with improved accessibility and economic development opportunities (City of Palm Bay parkway page). The 1.67-mile section built with it carries two vehicle travel lanes and a 7-foot buffered bike lane in each direction, plus a 6-foot sidewalk and a 12-foot multi-use path.
The signal at the Babcock Street end was rebuilt in 2024 and 2025. Palm Bay Infrastructure Advisory and Oversight Board minutes from September 23, 2024 report that the old span wire and concrete poles at Babcock and St. Johns Heritage Parkway had been removed and that crews were working on the median and turn lanes (IAOB minutes, September 23, 2024). By April 28, 2025, Public Works told the board that St. John's Heritage Parkway at Babcock Street was open and fully functional (IAOB minutes, April 28, 2025).
Three other I-95 exits appear in a city traffic notice. A February 2026 City of Palm Bay traffic notice names Malabar Road (Exit 173), Palm Bay Road (Exit 176) and U.S. 192 (Exit 180) (City of Palm Bay notice).
Why is there a gap between Babcock Street and Malabar Road?
The Babcock Street to Malabar Road link of St. Johns Heritage Parkway has a studied corridor but no money: Brevard County's study found five viable corridors and recommended Alternates A and C for a future PD&E study that is unfunded (Brevard County Public Works).
The Alternative Corridor Evaluation began in January 2020 and is now complete. Brevard County held virtual public meetings on May 25, 2021 and December 8, 2022, and states that a project of this magnitude generally takes between 10 and 12 years to complete depending on the availability of funding (Brevard County ACE). The county page says the project is now with the City of Palm Bay; the Palm Bay City Manager's Office, which includes two Deputy City Managers, lists (321) 952-3400 (City of Palm Bay City Manager).
Palm Bay followed the study through its own board. The Infrastructure Advisory and Oversight Board took an update on the St. Johns Heritage Parkway Alternative Corridor Evaluation at its February 28, 2022 meeting at City Hall (IAOB minutes, February 28, 2022).
The regional plan prices the Palm Bay gap. The Space Coast TPO Advance 2050 needs list gives the Babcock St to Malabar Rd new roadway a total cost of $458,652,514 and a second new piece, St. Johns Heritage Pkwy S from I-95 to Micco Rd, 2.24 miles at $76,682,785 (Space Coast TPO Advance 2050, Appendix F). Neither row appears in the plan's cost feasible list.
How does the parkway reach I-95 at the north end?
North of Palm Bay the parkway crosses U.S. 192 and continues as St. Johns Heritage Parkway/Ellis Road to the southbound I-95 entrance ramp (City of Palm Bay notice, February 2026).
The route served as a detour during FDOT's February 2026 I-95 resurfacing closures: the City of Palm Bay detour told westbound U.S. 192 drivers to turn right onto St. Johns Heritage Parkway/Ellis Road and travel north to reach southbound I-95 (City of Palm Bay). Brevard County Public Works says the corridor has seen increased traffic since the construction of the interchange at I-95 and Ellis Road in 2020, and lists Ellis Road as a two-lane road from I-95 to Wickham Road (Brevard County Ellis Road Widening).
More work is listed for the north end. The Space Coast TPO needs list includes widening US 192 to six lanes with interchange improvements from St. Johns Heritage Pkwy to Coastal Ln, and a Norfolk Pkwy extension from St. Johns Heritage Pkwy (Space Coast TPO Advance 2050, Appendix F).
What is planned next for St. Johns Heritage Parkway?
The next planned change in Palm Bay is four lanes between Malabar Road and north of Emerson Drive, which the city is designing now with July 2026 as the estimated design finish (City of Palm Bay).
Construction of those four lanes is currently unfunded, and the city cites emergency evacuation and emergency response times among the reasons for widening (City of Palm Bay widening page). The full schedule, cost and funding record for that design has its own page in this Palm Bay transportation section. The longer need runs past the city: the TPO lists widening St. Johns Heritage Pkwy from Malabar Rd to US 192 over 6.09 miles at a total of $147,927,610 (Space Coast TPO).
Palm Bay Public Works said in April 2025 that the city was losing out on potential grant funding by not having one hundred percent of plans finalized, and set a goal of more design plans ready for construction (IAOB minutes, April 28, 2025). Last verified: October 12, 2026, on the City of Palm Bay and Brevard County Public Works pages for the parkway.
Frequently asked questions
Does St. Johns Heritage Parkway connect Babcock Street to Malabar Road?
No. The parkway has a gap between Babcock Street and Malabar Road in Palm Bay. Brevard County studied corridors for it in an Alternative Corridor Evaluation that recommended Alternates A and C, but the next study phase is unfunded and the project now sits with the City of Palm Bay.
When did the I-95 interchange at St. Johns Heritage Parkway open?
The City of Palm Bay lists a ribbon cutting on August 11, 2020 for the diverging diamond interchange on I-95 just north of Micco Road, with a 1.67-mile parkway section running from it to Babcock Street near Davis Lane.
Who is responsible for St. Johns Heritage Parkway?
The City of Palm Bay describes the southern program as a joint effort of the city, Brevard County and the Florida Department of Transportation. Brevard County Public Works ran the corridor study for the gap and handed it to Palm Bay, and Palm Bay Public Works is designing the widening near Emerson Drive.
Which I-95 exits serve Palm Bay besides the parkway?
A February 2026 City of Palm Bay traffic notice names three I-95 interchanges: Malabar Road at Exit 173, Palm Bay Road at Exit 176 and U.S. 192 at Exit 180. The St. Johns Heritage Parkway SE interchange near Micco Road adds a fourth.
How wide is St. Johns Heritage Parkway near Emerson Drive?
Between Malabar Road and north of Emerson Drive the parkway is a two-lane undivided road, according to the City of Palm Bay. The city is designing four lanes for that stretch, with design expected in July 2026 and construction not yet funded.
Sources
- I-95 Interchange at St. Johns Heritage Parkway SE Now Open, City of Palm Bay https://www.palmbayfl.gov/parkway Used for: August 11, 2020 ribbon cutting, diverging diamond north of Micco Road, joint city, county and FDOT program, 1.67-mile section to Babcock Street near Davis Lane, lanes, bike lanes, sidewalk, multi-use path
- St. Johns Heritage Parkway Alternative Corridor Evaluation, Brevard County Public Works https://www.brevardfl.gov/PublicWorks/Projects/StJohnsHeritageParkwayAlternativeCorridorEvaluation Used for: ACE limits Babcock Street to Malabar Road about 14 miles, schedule, five corridors, Alternates A and C, unfunded PD&E, 10 to 12 years, handoff to Palm Bay, public meetings
- Ellis Road Widening, Brevard County Public Works https://www.brevardfl.gov/PublicWorks/Projects/EllisRoadWidening Used for: interchange at I-95 and Ellis Road built in 2020, Ellis Road limits
- City of Palm Bay news, Traffic Advisory: overnight ramp closures at I-95 interchanges at U.S. 192 and Palm Bay Road (February 9, 2026) https://www.palmbayfl.gov/Home/Components/News/News/13339/17?arch=1 Used for: St. Johns Heritage Parkway/Ellis Road north of U.S. 192 to the southbound I-95 ramp; exit numbers 173, 176 and 180
- St. Johns Heritage Parkway (SJHP) Four-Lane Widening, City of Palm Bay https://www.palmbayfl.gov/government/city-departments-f-to-z/public-works/projects/st-johns-heritage-parkway-sjhp-four-lane-widening-from-malabar-road-to-north-of-emerson-drive Used for: Malabar Road to north of Emerson Drive segment is two-lane undivided; design July 2026; construction unfunded; evacuation purpose
- Space Coast TPO Advance 2050 Long Range Transportation Plan, Appendix F needs list, page 3 https://www.spacecoasttpo.com/home/showpublisheddocument/3052/639008738332770000#page=3 Used for: parkway needs: Malabar Rd to US 192 widening, Babcock St to Malabar Rd new road, I-95 to Micco Rd new road, US 192 widening, Norfolk Pkwy extension
- Palm Bay Infrastructure Advisory and Oversight Board minutes, April 28, 2025, page 3 https://www.palmbayfl.gov/home/showpublisheddocument/28061#page=3 Used for: parkway at Babcock Street open and fully functional
- Palm Bay Infrastructure Advisory and Oversight Board minutes, September 23, 2024, page 2 https://www.palmbayfl.gov/home/showpublisheddocument/27681/638730498306930000#page=2 Used for: Babcock and parkway signal rebuild
- Palm Bay Infrastructure Advisory and Oversight Board minutes, February 28, 2022, page 2 https://www.palmbayfl.gov/home/showpublisheddocument/25303/637835489745830000#page=2 Used for: ACE update to the city board
- City Manager, City of Palm Bay https://www.palmbayfl.gov/government/city-departments-a-to-e/city-manager Used for: City Manager's Office phone (321) 952-3400 and two Deputy City Managers (fact-check re-source)